Zephyr ASU - E42ASX, ASU - M90ASX Installation - Power Supply Connection, General, BLACK = L line

Models: ALA - M90ABX ALA - E42AWX ALA - M90AWX ALA - E42ABX AED - M90ASX ASU - E42ASX ASU - M90ASX

1 27
Download 27 pages 57.09 Kb
Page 22
Image 22
Installation - Power Supply Connection

www.zephyronline.com

Installation - Power Supply Connection

 GENERAL GENERAL

Carefully read the following important information regarding installation safety and maintenance. Keep this information booklet accessible for further consultations.

POWER SUPPLY CONNECTION

For connection to the power supply refer to the following:

1. Lift the bottom part of the duct cover and secure it carefully using adhesive tape.

2. Remove the power supply cover by un- doing the (2) screws Fig. 11.

3. Break through the hole on the box co- ver.

4. Secure the power supply conduit to the cover.

5. Connect the wires of the hood to those of the power supply as described. Fig.11:

BLACK = L line

WHITE = N neutral

GREEN / YELLOW = G ground

- A double-pole switch properly rated must be installed to provide the range hood power supply disconnection.

- Connect the electrical conduit to the Field Wiring Compartment using listed onduit fittings.

- Carry out the power supplly connection in accordance with the national electric code, ANSI/NFPA 70-1999.

6.Insert the wires into the box, then close the box cover, securing it using the screws that were previously removed.

7.Remove the adhesive tape from the chimney and place the lower part of the chimney on the hood.

- 22 -

Page 22
Image 22
Zephyr ASU - E42ASX Installation - Power Supply Connection, General, BLACK = L line, GREEN / YELLOW = G ground