I

N S T A L L A T I O N

NIC Installation and Verification

The green Link LED should come ON and remain ON until the printer reaches READY.

The yellow Net Traffic should blink 3 to 4 times a second until the printer reaches READY.

This process may occur twice; the NIC will start a power up sequence and then the printer will issue an additional NIC reset during the printer initialization sequence.

4.Check the LEDs again after the printer reaches READY. Ready indicates the NIC is connected to the network.

The green Link LED should come ON and remain ON (this indicates that there is connectivity to a network hub/switch).

The yellow Net Traffic LED should blink intermittently as it detects traffic on the network.

If the LEDs do not behave as described above, refer to page 12-3. There is also the possibility that the NIC may be defective.

5.Check the NIC Configuration test print. Keep it to refer to when configuring NIC network-related parameters.

6.If you have taken the default settings and will not be using TCP/IP, the installation is complete. Proceed to the chapter that describes installing the printer on your system.

If you will be using TCP/IP, continue to section 2.8.

Note: Do not confuse this “NIC configuration” test page with the “Printer” test page that is produced from the printer front control panel. This 10/100 NIC is completely configured using remote configuration utilities. If you are not using NIC factory defaults and are concerned with discrepancies between test pages, you should also enter pertinent parameters, i.e.,TCP/IP address, via the front control panel.

2-6

July 1998

Page 24
Image 24
Kodak 3H0610, Kodak 10/100 Network Interface Card manual T a L L a T I O N