For outdoor installation with built in vent, the heater must be placed in a suitable area on a level, noncombustible surface. Do not install the heater under an overhang with clearances less than 3 feet from the top of the heater. The area under an overhang must be open on three sides.

Maintain minimum clearances as indicated below. Install a minimum of 4 feet below, and 4 feet horizontally from any opening to a building, see Figure 17.

IMPORTANT!

When locating the heater, consider that high winds can roll over or deflect off adjacent buildings and walls. Normally, placing the heater at least three feet from any wall will minimize downdraft.

NOTE

This unit shall not be operated outdoors at temperatures below -20oF. for natural gas.

OUTDOOR INSTALLATION

MINIMAX NT VENTING GUIDELINES

Walkway

 

A

 

D

1'

B

3'

 

 

 

4'

C

4'

4'

Property Line

E

ECheck local building codes for setback requirements.

Figure 17.

Vent Termination:

Must be not less than 7 ft. above public walkways.

AMust be at least 3 ft. above any forced air inlet located within a 10 ft. radius.

Must be located the following distances away from any door, window, or gravity air inlet:

B4 ft. below, or

C4 ft. horizontally, or

D1 ft. above

Rev. C 11-1-01

P/N 471593

Image 19
Contents For additional free copies of this manual call 800 MiniMax NT Low NOx SeriesTable of Contents Code Requirements MiniMax NT Low NOxSafety Rules Warranty InformationOperation Operation Lighting For Your Safety Read Before LightingSpecifications Installation InstructionsELECTRICAL, ALL HSI Units Installation ElectricalWire Remote TWO-WIRE or THREE-WIRE Remote HOOK-UPInstallation Remotes Three-wire remote Wiring Installation Single VoltageVoltage Installation SingleMiniMax NTLow Code or Superceding Local Wiring CodesPlumbing Water ConnectionsPlumbing Connections GAS Connections Indoor VENTING-General Requirements Installation Indoor See page 17 for Indoor Vent Adaptors Indoor Vent Adaptors Fits ALL Models Indoor InstallationVentilation Installation OutdoorBasic System Operation General DescriptionBasic Operation Typical Water Pressure Switch Safety ControlsAIR Pressure FAN Switch Water Pressure SwitchOperation of Ignition Module Normal Operation no Remote Pentair Temperature Controller 7800 LayoutGeneral Basic Thermostat OperationTime Setting To Change the Factory Temperature SettingsTemperature & Time Setting Programming Time Setting Programming Time SETTING, cont’dSpring and Fall Operation Maintenance InstructionsMaintenance Energy Saving TipsIf pH becomes too high over alkaline, it has these effects Maintenance Water TreatmentChemical Balance Pool and SPA WaterNormal Operation Sequence Troubleshooting-Normal Operation Sequence of HeaterPower Service Current Temp SET TEMP/TIME Troubleshooting-Normal Operation of HeaterTroubleshooting & Service Service Checks Service CHECKS-IGNITION ModuleFlame Sensor Current Check Heater Short Cycling Rapid On and Off Operation Troubleshooting GeneralMinimax NT LOW NOx Heater Single Voltage Description QTY Minimax NT LOW NOx Heater Dual Voltage MiniMax NT Low NOx Dual Voltage Replacement parts Rev. C Rev. C Rev. C MiniMax NT Low NOx Heaters Limited Warranty