Pentair 250, 300 installation manual See page 17 for Indoor Vent Adaptors

Page 16

Installation (Indoor)

16

 

 

INDOOR INSTALLATION (USA ONLY) OUTDOOR SHELTER INSTALLATION (CANADA)

See page 17 for (Indoor) Vent Adaptors

All products of combustion and vent gases must be completely removed to the outside atmosphere through a vent pipe which is connected to the stack adaptor. A vent pipe extension of the same size must be connected to the indoor stack adaptor and extended at least 2 feet higher than highest point of the roof within a 10 foot horizontal radius, and at least 3 ft. higher than the point at which it passes through the roof, or as permitted by local code; see Figures 11 and 12. The vent should terminate with an approved vent cap (weather cap) for protection against rain or blockage by snow. Double- wall vent pipe and an approved roof jack shall be employed through the roof penetration.

The heater must be located as close as practical to a chimney or gas vent.

CAUTION

The heater should be installed at least 5 feet away from the pool or spa.

The heater must be placed in a suitable room on a non- combustible floor or on a non-combustible base and in an area where leakage from heat exchanger or water connections will not result in damage to the area adjacent to the heater or the structure. When such locations cannot be avoided, it is recommended that a suitable drain pan with adequate drainage, be installed under the heater. The pan must not restrict air flow.

Installations in basements, garages, or underground structures where flammable liquids may be stored must have the heater elevated 18 inches from the floor using

anon-combustible base. The following minimum clearances from combustible materials must be provided.

 

Side

Front

Back

Top

Water Connection

18 in.

24 in.

-

-

Remaining

6 in.

-

6 in.

-

 

 

 

 

 

Ceiling Clearance

-

-

-

18 in.*

 

 

 

 

 

*To ceiling or roof.

 

 

 

 

 

 

10 ft.

 

 

 

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cap

 

 

 

 

 

 

 

 

Ridge

2 ft.

min.

3 ft. min.

Roof

Jack

Chimney

Figure 11.

VENT CAP AND

RISER FURNISHED

BY INSTALLER

AIR SUPPLY

VENTILATION

AIR SUPPLY

GAS COMBUSTION

OPTIONAL SIDE WALL VENT NT

Figure 12.

 

The heater should not be installed closer than 6 inches to any fences, walls or shrubs at any side or back, nor closer than 18 inches at the plumbing side. A minimum clearance of 24 inches must be maintained at the front of the heater.

 

6"

DOOR

6"

 

24"

 

 

18"

Figure 13.

P/N 471593

Rev. C 11-1-01

Image 16
Contents MiniMax NT Low NOx Series For additional free copies of this manual call 800Table of Contents MiniMax NT Low NOx Code RequirementsSafety Rules Warranty InformationOperation For Your Safety Read Before Lighting Operation LightingInstallation Instructions SpecificationsInstallation Electrical ELECTRICAL, ALL HSI UnitsWire Remote TWO-WIRE or THREE-WIRE Remote HOOK-UPInstallation Remotes Three-wire remote Installation Single Voltage WiringInstallation Single VoltageCode or Superceding Local Wiring Codes MiniMax NTLowPlumbing Water ConnectionsPlumbing Connections GAS Connections Installation Indoor Indoor VENTING-General RequirementsSee page 17 for Indoor Vent Adaptors Indoor Vent Adaptors Fits ALL Models Installation IndoorInstallation Outdoor VentilationBasic System Operation General DescriptionBasic Operation Safety Controls AIR Pressure FAN SwitchWater Pressure Switch Typical Water Pressure SwitchOperation of Ignition Module Pentair Temperature Controller 7800 Layout GeneralBasic Thermostat Operation Normal Operation no RemoteTime Setting To Change the Factory Temperature SettingsTemperature & Time Setting Programming Time SETTING, cont’d Time Setting ProgrammingMaintenance Instructions MaintenanceEnergy Saving Tips Spring and Fall OperationMaintenance Water Treatment Chemical BalancePool and SPA Water If pH becomes too high over alkaline, it has these effectsTroubleshooting-Normal Operation Sequence of Heater Normal Operation SequenceTroubleshooting-Normal Operation of Heater Power Service Current Temp SET TEMP/TIMETroubleshooting & Service Service Checks Service CHECKS-IGNITION ModuleFlame Sensor Current Check Troubleshooting General Heater Short Cycling Rapid On and Off OperationMinimax NT LOW NOx Heater Single Voltage Description QTY Minimax NT LOW NOx Heater Dual Voltage MiniMax NT Low NOx Dual Voltage Replacement parts Rev. C Rev. C Rev. C MiniMax NT Low NOx Heaters Limited Warranty