SERVICING PROCEDURES

TUBE CLEANING PROCEDURE (TYPICAL)

Establish a regular inspection schedule, the fre- quency depending on the local water condition and severity of service. Do not let the tubes clog up solidly. Clean out deposits over 1/16" in thickness.

Although the illustration shows the mechanical clean- ing procedure of a small boiler, it is typical of all sizes. The boiler may be cleaned from the return header side as shown, without breaking pipe connections. It is preferable, however, to remove both headers for better

visibility through the tubes and to be sure the ground up lime dust does not get into the system.

Note that you do not remove the top pan or the heat exchanger, generally.

After reaming, mount the wire brush in lieu of the auger and clean out the debris remaining in the tubes.

Another method is to remove the heat exchanger, ream tubes and immerse heat exchanger in non-inhib- ited de-scale solvent.

RAYPAK TUBE CLEANING KIT

Extension Pieces (5)

Auger with Carbide Tip

Wire Brush

Fig. #8154.0

Fig. #6049

23

Image 23
Contents Installation and Operating Instructions Raythermtm Contents Code Requirements Base InstallationImportant Notice Outdoor Heaters Models ClearancesALL Heaters Outdoor HeatersZ223.1/NFPA VentingconnectionsFIG. #8090.0 GAS Supply ConnectionsLocation Pipe Sizing for GAS ConnectionsWaterconnections Unitherm Governor Operation Water Pressure SwitchControls Automatic Chlorinators and Chemical FeedersFlow RATES/WATER Connections Models 1287/1336 1758/1826Poolstat Control Page To adjust the temperature Models 2100 thru LOW Water CUT-OFF Temperaturecontrols HighlimitsPool Stat Electronic Ignition High & LOW GAS Pressure SwitchesElectrical Wiring Wiring Diagram Models 926 Wiring Diagram MODELS1287-1826 Wiring Diagram Models Wiring Diagram Models Pressure Switch Adjustment TemperaturecontrolPressure Switch START-UPPROCEDURES Controls InspectionproceduresAfter START-UP Main Burner FlameRaypak Tube Cleaning KIT Servicing ProceduresTube Cleaning Procedure Typical GAS Valve Removal Pilot Removal and CleaningHeat Exchanger Reassembly Burner Drawer RemovalUnitherm Governor Replacement Control Well ReplacementTube Replacement Procedure Procedure for Cleaning Flue GAS PassagewaysWinterization MaintenanceandcareCause Mechanical for Qualified Service Personnel onlyProblem SolutionThis does not take into account heat High Voltage Electrical Electronic Ignition IID IIDReplacement Parts List Page Page Page Models 2100, 2500, 3001, 3500 Page Page Exclusive Warranty Limitation of Liability Heat Exchanger WarrantyParts Replacement To Make Warranty ClaimLitho in U.S.A