Raypak P-926, P-1826, P-2100, P-4001, 1287-1758, 2100-4001 This does not take into account heat

Page 28

Outer jacket very hot (paint blistered)

Takes long time to heat pool or spa

Liming

Leaking at well.

Leaking at heat exchanger.

Gasket brittle and leaking- (overheated).

*Broken refractory caused by

 

 

 

shipping damage or improper

 

 

 

combustion…………………………..

Replace refractory panels.

Excessive sooting of heat

 

 

 

exchanger…………………………...

Determine cause of sooting &

 

correct.

Calculate temperature in °F/hr……...

Heat rise (°F/hr.) = Htr.output

 

 

 

 

 

Pool gallonage x 8.33

 

or refer to heater sizing chart.

 

This does not take into account heat

Filter not running long enough……....

loss due to weather.

Reset time clock.

Dirty filter……………………………..

Clean filter.

Gas line or meter under-

 

 

 

sized………

Refer to installation instructions.

Bypassing too much water………....

Inspect bypass for movement, if no

U/G not functioning………………

movement, replace.

Replace if no movement when

Overacid…………………………

heated.

Replace well and maintain water

Overacid……………………………...

chemistry properly.

Replace heat exchanger and main-

Heater running after pump

tain chemistry properly.

 

 

 

shuts off……………………………...

See pressure switch adjustment.

Refractory damage………………….

Replace refractory.

Sooted heater………………………..

Determine cause of sooting and cor-

 

rect.

*Usually occurs on initial start-up

 

 

 

28

Image 28
Contents Installation and Operating Instructions Raythermtm Contents Important Notice Base InstallationCode Requirements Clearances ALL HeatersOutdoor Heaters Outdoor Heaters ModelsVentingconnections Z223.1/NFPAGAS Supply Connections FIG. #8090.0Waterconnections Pipe Sizing for GAS ConnectionsLocation Water Pressure Switch ControlsAutomatic Chlorinators and Chemical Feeders Unitherm Governor OperationModels 1287/1336 1758/1826 Flow RATES/WATER ConnectionsPoolstat Control Page To adjust the temperature Models 2100 thru Pool Stat Temperaturecontrols HighlimitsLOW Water CUT-OFF Electrical Wiring High & LOW GAS Pressure SwitchesElectronic Ignition Wiring Diagram Models 926 Wiring Diagram MODELS1287-1826 Wiring Diagram Models Wiring Diagram Models Pressure Switch TemperaturecontrolPressure Switch Adjustment START-UPPROCEDURES Inspectionprocedures After START-UPMain Burner Flame ControlsTube Cleaning Procedure Typical Servicing ProceduresRaypak Tube Cleaning KIT Pilot Removal and Cleaning Heat Exchanger ReassemblyBurner Drawer Removal GAS Valve RemovalControl Well Replacement Tube Replacement ProcedureProcedure for Cleaning Flue GAS Passageways Unitherm Governor ReplacementMaintenanceandcare WinterizationMechanical for Qualified Service Personnel only ProblemSolution CauseThis does not take into account heat Electrical Electronic Ignition IID IID High VoltageReplacement Parts List Page Page Page Models 2100, 2500, 3001, 3500 Page Page Heat Exchanger Warranty Parts ReplacementTo Make Warranty Claim Exclusive Warranty Limitation of LiabilityLitho in U.S.A