WARNING: If Common - Ground is > 1 VAC,

STOP: Contact electrician to correct ground failure. Failure to do this may burn out 120V-24V transformer, or may cause other safety control damage or failure.

Attach Manometers to Measure Pressures

Attach 24" scale manometer to the first main gas shut-off valve pressure tapping.

Attach one 12" scale manometer to the manifold gas pressure tapping. (See gas valve detail on page 7.)

Attach one 12" scale manometer to — Pull rubber tube from air pressure switch off the aluminum tubing and connect the manometer using a tee.

Turn Off Main Gas Valve;

Check the Gas Supply Pressure

1.Slowly turn on main gas shut-off valve.

2.Read the gas supply pressure from the manome- ter; minimum supply pressure is 5” W.C., recommended supply is 7” W.C. for natural gas (minimum 11” W.C. for LP gas).

3.If pressure is > 14" W.C., turn off the valve.

4.Check if the service regulator is installed and/or adjust the service regulator.

Start-Up

Blower Adjustment

1.Disconnect fan pressure switch tubing at plenum and connect manometer using a tee.

2.Close all manual firing valves.

3.Turn power on.

4.Check manometers attached to fan pressure switch. The readings should be :

0.5 ± 0.1 in. WC for models 102 and 122.

0.7 ± 0.1 in. WC for models 202, 242, 322.

If not, adjust the air shutter on the blower to attain the correct value. (See air shutter adjustment page 7).

5. Turn power off.

6.Reconnect fan pressure switch tubing to original position.

Main Burner Adjustment

1.Turn off unit.

2.Open manual firing valve.

3.Turn on the unit, wait 15 seconds, and the igniter should glow. Sight glass to check igniter at both ends of the heater. Gas valve should be open after 45 seconds.

4.If burner does not light on first trial. It will retry, up to 3 times.

5.Main burner ignition – check manifold gas pres- sure at gas valve manifold pressure tap. (See gas valve detail page 7) This should read 3.5 ± 0.1 in. WC for natural gas or 10.5 ± 0.1 in. WC for LP gas.

6.If the pressure reading differs by more than ± 0.1 in. WC. Remove manifold adjustment screw cover off the pressure regulator on the gas valve, adjust main burner manifold pressure. Replace the man- ifold adjustment screw cap on the gas valve.

Your Hi Delta is tuned in!

Safety Inspection

Replace main gas manifold adjustment screw cap.

Check all thermostats and high limit settings.

During the following safety checks leave manome- ters hooked up, check and record.

If other gas fired equipment are in the room and on same gas main check all pressures on the Hi Delta with all other equipment running.

Check thermostats for ON/OFF operation.

Check High limits for ON/OFF operation.

While in operation, check flow switch operation

Check the low gas pressure switches (For proper adjustment, if available, use the attached manometers to set pressure. The scales on the switch are approximate only); Low gas pressure switch must be set at 5 in. WC for natural gas and 10 in. WC for LP gas.

High gas pressure switch (optional) at 1 in. WC above manifold pressure.

Insert ignition control lockout tests as safety check.

37

Image 37
Contents Installation & Operating Instructions Page Contents Are important but not related to personal injury hazards Installations at Elevation Before InstallationProduct Receipt Model IdentificationComponent Locations-Back Component LocationsModel Quantity Vent Size Burners Gas Valves Blowers Flue General InformationModel Burners per Valve Stages Fire at Stage Time/Temperature Relationships in Scalds General SafetyWater Time to Produce Serious Temp Burn Installation Codes InstallationIndoor Installations Equipment BaseHeater Min. Clearance Recommended From Combustible Outdoor InstallationsCombustion and Ventilation Air InstallationsConventional Combustion Air Supply Indoor UnitsWater Piping Canadian InstallationsGeneral Relief Valve PipingHydronic Heating Dual Boiler-Primary/Secondary Piping Piping-Heating Boilers Domestic Hot Water PipingAir-Separation/Expansion Tank Three-Way ValvesSingle Heater-Domestic Hot Water with One Storage Tank Gas Supply Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterGas Pressure Regulator Gas Supply Connection Gas Supply PressureCheck the Power Source Electrical Power ConnectionsSurge Protection Making the Electrical ConnectionsSingle Stage and 2-Stage Tankstat Electrical Connections-Domestic Hot WaterDefinition of Appliance Categories VentingSupport of Vent Stack Barometric DamperVent Terminal Location Table I Vent/Air Inlet Termination Clearances Canada Installations US InstallationsVenting Configurations Venting Installation TipsNatural Draft Vertical Vent Termination Natural Draft Vertical Venting System InstallationCategory Inches Length feet Model Appliance Certified Vent Size Max. VentingHorizontal Thru-wall Direct Vent Termination Venting Air Intake Certified Max Combustion Air Inlet Max. AirCategory Inches Length FeetHorizontal Thru-wall Direct Vent Termination Venting Min./Max Combustion Max. Air CertifiedCategory Inches Height InchesVertical Direct Vent System Installation Outdoor InstallationVertical Direct Vent Termination Controls High Limit Manual ResetIgnition Control Module Low Water Cut Off Optional Flow SwitchWiring DIAGRAM-MODELS Initial START-UP PRE-START-UPSafety Inspection Main Burner AdjustmentStart-Up Operation Post START-UP CheckFollow-Up Operating InstructionsSuggested Minimum Maintenance Schedule MaintenanceTo Turn Off Gas To Appliance Yearly Beginning of each heating seasonInside Combustion Air Contamination AppendixMonthly QuarterlyCorporate Headquarters Page
Related manuals
Manual 56 pages 23.48 Kb

122-322 specifications

Raypak 122-322 is a cutting-edge pool and spa heater designed for optimal performance and efficiency. Known for its robust construction and reliable heating capabilities, this heater has become a preferred choice among pool owners.

One of the standout features of the Raypak 122-322 is its advanced copper fin tube heat exchanger. This innovative technology enhances the heater's efficiency by maximizing heat transfer while minimizing energy consumption. By efficiently circulating the water through the heat exchanger, the Raypak 122-322 quickly raises the temperature, allowing for an enjoyable swimming experience regardless of the weather.

The heater is equipped with a digital control system that allows for precise temperature adjustments. This user-friendly interface makes it easy to set and maintain the desired water temperature, promoting user convenience. The digital controls also provide diagnostic features, which simplify troubleshooting and maintenance, ensuring the heater operates smoothly for years to come.

Safety is a crucial aspect of the Raypak 122-322. It comes with a series of safety features, including a flame rollout switch, high limit switch, and a pressure switch that ensures the unit operates safely under various conditions. This focus on safety provides peace of mind for users, knowing that their heating system is designed with protective measures in place.

The Raypak 122-322 is environmentally friendly, designed to use less energy compared to conventional heating systems. Its efficient performance not only reduces operational costs but also lessens the overall environmental impact, making it a responsible choice for conscious consumers.

With a compact design, the Raypak 122-322 can fit easily into various installation spaces, making it versatile for numerous residential or commercial settings. Additionally, the unit is built with durable materials resistant to corrosion and weather conditions, ensuring longevity and minimal maintenance requirements.

Overall, the Raypak 122-322 stands out in the market due to its advanced features, safety mechanisms, energy efficiency, and ease of use. It exemplifies a perfect blend of innovation and reliability, making it an exceptional option for anyone looking to enhance their pool or spa experience.