Bryant ASPAX1BBA015 owner manual Adjusting the Regulator Natural GAS only, Dual Fuel Regulators

Page 13

Section 2 — Post Installation Start-up and Adjustments

15 kW Generator

With the generator running and loads powered by generator AC output, turn ON the utility power supply to the transfer switch. The following should occur:

After about six seconds, the switch should transfer loads back to the utility power source.

About one minute after retransfer, the engine should shut down.

2.6ADJUSTING THE REGULATOR

(NATURAL GAS ONLY)

Although the generator has been factory set to pro- vide maximum power, it may be necessary in some areas to adjust this setting. Because natural gas has different BTU or power content across the country the engine may not perform as designed.

If experiencing engine problems at high or full load conditions follow these steps. It will require a fre- quency meter to perform this procedure.

1.Turn off utility power to the main distribution panel in the house. This can be done by switching the service main breaker to the off or open posi- tion.

2.Allow the generator to start before loading the generator. Confirm the no-load frequency with the roof open and door off is set at 63-63.5 Hz. Transfer load to emergency circuits.

3.Turn on appliances, lights, pumps, etc., that are on the emergency circuits in an attempt to fully load the generator. Be cautious not to overload the generator. Use the following chart as a guide:

 

Unit

120 Volts

240 Volts

 

 

15 kW

108.3 amps

54.2 amps

 

Figure 2.1 — Dual Fuel Regulators

V-twin

410

Adjustment

Adjustment

Set

Screw

Screw

(One Side

Pin

(Both Sides)

Only)

 

 

 

Set Pin

(Both Sides)

6.When the highest frequency is reached maximum power has been set. Then turn both adjustment screws 1/4 turn counterclockwise. Regulator is now set.

Figure 2.2 — Placement of Regulator

Adjustment Screw

4.When full load has been achieved. Connect a fre- quency meter to the output lugs of the generator’s main line circuit breaker.

5.The fuel regulator is fitted with two adjustment screws. While watching the frequency meter, slowly turn the adjustment screw clockwise or counterclockwise one at a time until highest fre- quency is read on the meter. Only limited adjust- ment is available between the set pins. Under no circumstances should any of the pins be removed (Figures 2.1 and 2.2).

7.Turn utility power to the main distribution panel back on. This can be done by switching the ser- vice main breaker to the on or closed position. Allow the generator to shut down.

Do not make any unnecessary adjustments. Factory settings are correct for most applica- tions. However, when making adjustments, be careful to avoid overspeeding the engine.

If this procedure or equipment are not available, locate the nearest Dealer and they can perform the adjustments.

NOTE:

A service fee may be charged for this adjustment.

11

Image 13
Contents Installation ‹ Operation and Maintenance ‹ Contents‹ HOW to Obtain Service IntroductionMaintenance Post Installation Start-up AdjustmentsTroubleshooting Introduction Inside Front Cover Warning  ‹ Standards Index  Explosion Hazards Location UNPACKING/INSPECTIONProtection Systems System SET LEDGfci GeneratorFuel Requirements Recommendations SpecificationsFuel Consumption ‹ 1.6.1 Generator‹ 1.9.1 15KW, 990CC Engines Fuel System‹ 1.10.1 Generator Battery Battery Installation‹ 1.10.2 Transfer Switch 10.2.1 15 kW UnitsBefore Initial START-UP Check Transfer Switch OperationElectrical Checks Checking Automatic Operation Generator Tests Under LoadDual Fuel Regulators Adjusting the Regulator Natural GAS onlyBREAK-IN Procedure Voltage Regulator Adjustment‹ 2.7.1 15 KW Units Automatic Transfer Operation ‹ 3.3.1 12 VDC Accessory Outlet‹ 3.2.1 Auto Position ‹ 3.2.2 OFF PositionSequence of Automatic Operation ‹ 3.5.1 Transfer to Generator Power SourceManual Transfer Operation ‹ 3.3.2 120 VAC Gfci Outlet‹ 3.5.2 Transfer Back to Utility Power Source Setting the Exercise Timer‹ 3.7.1 LOW OIL Pressure Switch ‹ 3.7.2 High Temperature SwitchFuses Checking the Engine OIL LevelChanging the Engine OIL Changing the OIL Filter ‹ 4.3.2 OIL Change ProcedureSpark Plugs ‹ 4.5.1 15 KW GeneratorsAdjusting Valve Clearance Battery MaintenanceCorrosion Protection Cooling System‹ 4.12.1 Removal from Service OUT of Service Procedure‹ 4.12.2 Return to Service Be performed by the nearest dealer Service ScheduleProblem Cause Correction Troubleshooting GuideMounting Dimensions Electrical Data Customer Connection KW Generator Electrical Schematic Drawing No E9017 SW1 Exploded Views and Parts Lists Part NO. QTY. Description KW Generator Control Panel Drawing No E9162-J Part NO. QTY Description 16B Item Part NO. QTY. Description 138 122 KNOB, AIR Cleaner Views and Parts Lists QTY Description KW Generator Gas Regulator Drawing No D8720-G CASTING, Twin Regulator Housing California and Federal Emission Control Warranty Statement Emission Control System Warranty Warranty Schedule