AEG 2.33 2 user manual Symbols and conventions used

Page 6

6

1.1.1. Symbols and conventions used

Warning

Carefully read the indicated paragraph and take the stated prevention measures.

Danger of electrical discharge

Pay special attention to it, both in the indication on the equipment and in the paragraph referred in this user manual.

Main protective earthing terminal

Connect the earth cable coming from the installation to this terminal.

Earth bonding terminal

Connect the earth cable coming from the installation to this terminal.

Notes of information

Additional topics that complement the basic procedures.

Preservation of the environment

The presence of this symbol in the product or in its associated documentation states that, when its useful life is expired, it will not be disposed with the domestic refuse. In order to avoid possible harm to the environment, separate this product from other refuse and recycle it appropriately. Users may contact their provider or with the relevant local authorities to be informed on how and where they can take the product to be recycled and/or disposed of correctly.

Image 6
Contents Protect 2.33 Contents Operation Maintenance, warranty and service Using this manual IntroductionSymbols and conventions used Safety and instructions For more information and helpQuality and standard guarantee Management declarationStandards Environmental protectionPresentation Views Views of the equipmentNot available for Protect 2.33 No -3 battery cabinet front view with front door closed Corresponding legends for the equipment views LCD Structure Structural schema Operating principleNormal operation Operation with mains failureOperation with inverter not active Operation in manual bypass Parallel operationThere are two operation modes possible Installation Important safety instructionsBattery safety instructions Cabinet access Bypass Input Output Set up and installation Unpacking and content checking Storage Transportation to siteLocation Connection To the mains connection, terminals X1 to Front view for parallel systemPage Connection of the output, terminals X6 to Page Interface relay contacts, connector Connection example between a UPS and two battery cabinetsCOM-interface RS232 and RS485, connector Connector DB9 X31Page EPO terminals Parallel BUS connectionParallel BUS Connection Start up procedure OperationStart up Control before start up Close Battery Switch Complete UPS shutdown LED indications control panel PCEmergency power off EPO operation Bypass manual switch Maintenance Principle of operationTransfer to maintenance bypass Transfer to normal operation Close Battery Switch Touch Screen Control panel and display descriptionControl panel parts Basic functions of keyboard from synopticControl panel parts Messages menus and classification in submenus MainMenu structure Screen description Main level screen menu Screen 0.0 Main ScreenUPS status control screen menu MainPage 3. ‘‘MEASURES level screen menu Page Page 4. ‘‘SETTINGS level screen menu Screen 3.0 Settings and its submenusModbus Screen Page Page 5. ‘‘ALARMS level screen menu UPS Rectifier blocks Alarm list displayed in the LCD panel Alarm Page Page Alarm Page Page Page Page Alarm Error in configuration memory 6. ‘‘DATA Logger level screen menu Screen 5.0 Data logger Page Battery fuses Maintenance, warranty and serviceBasic maintenance guide BatteriesWarranty conditions Cooling FanCapacitors Annexes Static Bypass Type External battery cabinet Dimensions & Weight External Battery CabinetSafety Instructions To provide forPage Page Page Operating Instructions 8000032013 BAL, EN