Installation Drawings
2.0INSTALLATION DRAWINGS
Figure 2 Two-Breaker  Maintenance Bypass Cabinet, one-input,  attached
Two Breaker Maintenance Bypass Cabinet
FBO  | MBB  | 
I  | MIB  | 
  | 
BFB
Critical
Load
Load Bank
(FBO)
  | CB1  | 
Main Input  | 
  | 
Switchgear  | UPS Module  | 
  | |
  | Battery  | 
  | System  | 
DC Bus | CB2  | 
  | |
  | N  | 
  | MBJ  | 
  | EG  | 
  | MIB - Maintenance Isolation Breaker  | 
MBD | MBB - Maintenance Bypass Breaker  | 
FBO – Furnished By Others  | |
  | N – Neutral  | 
  | EG – Equipment Ground  | 
  | MBJ – Main Bonding   | 
I - Option Interlock
7