Emerson UPS Systems installation manual Installation Drawings

Page 11

Installation Drawings

2.0INSTALLATION DRAWINGS

Figure 2 Two-Breaker Maintenance Bypass Cabinet, one-input, attached

Two Breaker Maintenance Bypass Cabinet

FBO

MBB

I

MIB

 

BFB

Critical

Load

Load Bank

(FBO)

 

CB1

Main Input

 

Switchgear

UPS Module

 

 

Battery

 

System

DC Bus

CB2

 

 

N

 

MBJ

 

EG

 

MIB - Maintenance Isolation Breaker

MBD

MBB - Maintenance Bypass Breaker

FBO – Furnished By Others

 

N – Neutral

 

EG – Equipment Ground

 

MBJ – Main Bonding Jumper(3-wire systems only)

I - Option Interlock

7

Image 11
Contents Liebert NXL Maintenance Bypass Cabinet Product Warranty Registration Table of Contents Figures Important Safety Instructions Introduction Positioning Power Cables Power Cable Connection Procedure Single-Module Mechanical Installation Installation Drawings Two-Breaker Maintenance Bypass Cabinet, two-input, attached Busbar Detail B Front Section A-A Bottom View Footprint Bottom View Footprint TOP View BUS BAR Detail a BUS Termination Detail Cable routing Front Run From Conductor Bypass Installation Drawings P1 D T Installation Drawings Interlock Control wiring connections withoutFrom Purpose Control wiring connections with interlockSection A-A Cabinet-to-Cabinet Liebert NXL Maintenance Bypass Cabinet specifications SpecificationsRecommended conduit and cable sizes-Maintenance Bypass Input Recommended conduit and cable sizes-Load Bank Output Recommended conduit and cable sizes-Module Bypass InputRecommended conduit and cable sizes-Module Output Recommended conduit and cable sizes-Load Output#4/0 AWG Recommended lug sizesSpecifications Page That Ne tIti Ti n