Emerson 710NPBA Replacement Information, Replacement Procedures, Replacing the ACU+ Controller

Page 24

UM581127000

User Instructions

Issue AB, March 22, 2012

Spec. No. 581127000 (Model 710NPBA)

 

 

press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

3)With the Manual menu screen displayed, navigate to and select “Converter” (ENT) / “All Conv Ctrl” (ENT).

4)Navigate to “Clear Conv Lost”. Press ENT. “Clear” highlights.

5)Press ENT to select the operation. Press ENT again to confirm.

6)Return to the Main screen by repeatedly pressing ESC (escape).

REPLACEMENT INFORMATION

When a trouble symptom is localized to a faulty rectifier module, converter module, controller, or system circuit card; that particular device or circuit card should be replaced in its entirety. Other than a rectifier module or converter module fan replacement, no attempt should be made to troubleshoot or repair individual components on any rectifier module, converter module, controller, or circuit card.

Refer to SAG581127000 (System Application Guide) for replacement part numbers.

REPLACEMENT PROCEDURES

Danger: Adhere to the “Important Safety Instructions” presented at the front of this document.

Replacing a Rectifier or Converter Module

Refer to the Rectifier User Instructions (UM1R243000) or Converter User Instructions (UM1C24481500) for a rectifier and converter module replacement procedure. Refer also to System Troubleshooting Information in this chapter.

The rectifier or converter module being replaced is assigned by the ACU+ the lowest available identification number. If desired, you can change the identification number, see “Configuring the ACU+ Identification of Rectifier Modules” or “Configuring the ACU+ Identification of Converter Modules” in Chapter 5 of the separate Power System Installation Manual (IM581127000).

Replacing the ACU+ Controller

Refer to the ACU+ User Instructions (UM1M820BNA) for a controller replacement procedure.

Page 18

Chapter 4. Troubleshooting and Repair

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 24
Contents UM581127000 Issue AB, March 22 User InstructionsSPEC. NO. Model 581127000 710NPBA Page Table of Contents General Safety BatteryVoltages AC Input Voltages DC Input/Output VoltagesCircuit Card Handling Static Warning Bound System Installation Manual Customer Documentation PackageSystem Description USB Drive with All Customer DocumentationModule Mounting Assembly Distribution CabinetACU+ Advanced Control Unit Plus Controller Rectifier ModulesLocal Controls and Indicators Refer to Figure Operating ProceduresCONTROLLER, RECTIFIERS, and Optional Converters Estop FunctionCircuit Card Locations Operating Procedures IB2System Interface Circuit Card Optional LVD Driver Circuit Card P/N Operating Procedures Optional LVD Driver Circuit CardOptional LVD Driver Lite Circuit Card Optional Manual Battery Disconnect Circuit Card Middle Position Normal OperationSystem Maintenance Procedures Installers connectionsMaintenance Procedures to be Performed at 6-Month Intervals User Instructions Issue AB, March 22 Spec. No Model 710NPBA ProcedureInstalling a Field Expansion Module Mounting Assembly User Instructions Spec. No Model 710NPBA Spec. No Model 710 Npba Issue AB, March 22 Communications Cables MaintenanceChanging the ACU+ LVD Control Level for a Contactor ACU+ Controller Configuration System Troubleshooting InformationTroubleshooting Alarm Conditions on the ACU+ Controller Contact InformationProcedure Clearing a Rectifier Lost Alarm Clearing a Converter Lost AlarmReplacement Information Replacement ProceduresReplacing a Rectifier or Converter Module Replacing the ACU+ ControllerDistribution Fuse Alarm Fuse Replacement Replacing a Distribution DeviceGeneral Replacing a TPS/TLS Fuse Procedure Fuseholder AssemblyReplacing a Bullet Nose Fuseholder Procedure Replacing a Bullet Nose Circuit Breaker Procedure Insert these terminalsInto corresponding sockets On distribution panelReplacing a TPH Fuse Procedure Replacing a TPL-B Fuse Troubleshooting and Repair Replacing a GJ/218 Circuit Breaker Procedure Installing Circuit Breaker Pole breaker shown Pole and 4-pole breakers similar List AC Only List BC Only Circuit Card Replacement Procedures Issue AB, March 22 Spec. No Model 710 NpbaSystem Interface Circuit Card Replacement Procedure UM581127000 TB2 Spec. No Model 710NPBA Issue AB, March 22 Relay Optional EIB Interface Board Assembly Top View SM-DU+ and Shunt Interface Assembly Replacement Procedure UM581127000 SM-DU+ Spec. No Model 710NPBA Issue AB, March 22 UM581127000 UM581127000 User Instructions Issue AB, March 22 Spec. No Model 710NPBA UM581127000 Procedure Removing the Distribution Panel Replacing a Distribution PanelInstalling the Distribution Panel Replacing a Distribution Panel Troubleshooting and Repair Replacing a Battery or Load Disconnect Contactor Procedure Removing the ContactorInstalling the Replacement Contactor Restarting the Power SystemWhite/Black Wire Spec. No Model 710 Npba Issue AB, March 22 Black Wire Load Disconnect Change Issue Number Description of Change LLP215523 New LLP216783 Misc. updates Revision RecordNetPerform Optimization Services Download service & maintenance reports OnlineFor More Information Answers technical product and system