Emerson 710NPBA manual TB2

Page 38

UM581127000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

User Instructions

Issue AB, March 22, 2012

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Spec. No. 581127000 (Model 710NPBA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

J1

 

 

J2

RS485 Connection

1B 2B 3B

J3

 

TB2 1A: RS485+

 

 

TB2 2A: RS485-

TB2

 

RS232 Connection

1A 2A 3A

J4

 

 

 

TB2 1B: CGND

 

 

TB2 2B: TXD232

 

 

TB2 3B:RXD232

 

 

 

J8

J10

 

 

J1, J2, J3, J4

Distribution Panels FA Inputs

J8

Selects to power Controller from “Battery Power” or not.

 

No

 

 

Battery

Battery

Shorting Jumper

Pwr

Pwr

J8

 

 

 

3

2 1

J10

Battery Monitoring External / Internal (see TB1-4 and TB1-5 for external monitoring points)

External Internal

1

TB1

5

 

J5

 

 

 

 

 

 

TP1 TP2 TP3 TP4

 

TB1-1: Battery Tray FA

TP1 (+) and TP2 (-)

TP3 (+) and TP4 (-)

TB1-2: External Battery FA

System Voltage

System Load

TB1-3: External System FA

Monitoring

Shunt Monitoring

TB1-4: External Battery Monitoring (-)

 

 

TB1-5: External Battery Monitoring (+)

 

 

1

2

3

Shorting Jumper

J5

CAN

7

8

9

J10

TB1

Wire Size Capacity: 22-12 AWG.

Recommended Torque: 3.0 in-lbs.

FA Signals: Battery applied to the terminal turns in an alarm.

Figure 4-9

System Interface Circuit Card Connector Locations

Page 32

Chapter 4. Troubleshooting and Repair

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 38
Contents SPEC. NO. Model 581127000 710NPBA UM581127000 Issue AB, March 22User Instructions Page Table of Contents Voltages General SafetyBattery AC Input Voltages DC Input/Output VoltagesCircuit Card Handling Static Warning System Description Bound System Installation ManualCustomer Documentation Package USB Drive with All Customer DocumentationACU+ Advanced Control Unit Plus Controller Module Mounting AssemblyDistribution Cabinet Rectifier ModulesCONTROLLER, RECTIFIERS, and Optional Converters Local Controls and IndicatorsRefer to Figure Operating Procedures Estop FunctionCircuit Card Locations Operating Procedures IB2System Interface Circuit Card Optional LVD Driver Circuit Card P/N Operating Procedures Optional LVD Driver Circuit CardOptional LVD Driver Lite Circuit Card Optional Manual Battery Disconnect Circuit Card Middle Position Normal OperationMaintenance Procedures to be Performed at 6-Month Intervals System Maintenance ProceduresInstallers connections User Instructions Issue AB, March 22 Spec. No Model 710NPBA ProcedureInstalling a Field Expansion Module Mounting Assembly User Instructions Spec. No Model 710NPBA Spec. No Model 710 Npba Issue AB, March 22 Communications Cables MaintenanceChanging the ACU+ LVD Control Level for a Contactor Troubleshooting Alarm Conditions on the ACU+ Controller ACU+ Controller ConfigurationSystem Troubleshooting Information Contact InformationProcedure Clearing a Rectifier Lost Alarm Clearing a Converter Lost AlarmReplacing a Rectifier or Converter Module Replacement InformationReplacement Procedures Replacing the ACU+ ControllerGeneral Distribution Fuse Alarm Fuse ReplacementReplacing a Distribution Device Replacing a TPS/TLS Fuse Procedure Fuseholder AssemblyReplacing a Bullet Nose Fuseholder Procedure Into corresponding sockets Replacing a Bullet Nose Circuit Breaker ProcedureInsert these terminals On distribution panelReplacing a TPH Fuse Procedure Replacing a TPL-B Fuse Troubleshooting and Repair Replacing a GJ/218 Circuit Breaker Procedure Installing Circuit Breaker Pole breaker shown Pole and 4-pole breakers similar List AC Only List BC Only System Interface Circuit Card Replacement Procedure Circuit Card Replacement ProceduresIssue AB, March 22 Spec. No Model 710 Npba UM581127000 TB2 Spec. No Model 710NPBA Issue AB, March 22 Relay Optional EIB Interface Board Assembly Top View SM-DU+ and Shunt Interface Assembly Replacement Procedure UM581127000 SM-DU+ Spec. No Model 710NPBA Issue AB, March 22 UM581127000 UM581127000 User Instructions Issue AB, March 22 Spec. No Model 710NPBA UM581127000 Procedure Removing the Distribution Panel Replacing a Distribution PanelInstalling the Distribution Panel Replacing a Distribution Panel Troubleshooting and Repair Installing the Replacement Contactor Replacing a Battery or Load Disconnect ContactorProcedure Removing the Contactor Restarting the Power SystemWhite/Black Wire Spec. No Model 710 Npba Issue AB, March 22 Black Wire Load Disconnect Change Issue Number Description of Change LLP215523 New LLP216783 Misc. updates Revision RecordFor More Information NetPerform Optimization ServicesDownload service & maintenance reports Online Answers technical product and system