Emerson 710NPBA manual CONTROLLER, RECTIFIERS, and Optional Converters, Estop Function

Page 9

User Instructions

UM581127000

Spec. No. 581127000 (Model 710NPBA)

Issue AB, March 22, 2012

 

 

CHAPTER 2.

OPERATING PROCEDURES

CONTROLLER, RECTIFIERS, AND OPTIONAL CONVERTERS

For operation instructions on these units, refer to the following documents.

ACU+ Controller User Instructions (UM1M820BNA)

Rectifier User Instructions (UM1R243000)

Converter User Instructions (UM1C24481500)

ESTOP FUNCTION

If an ESTOP switch is wired to the ACU+ IB2 Interface Board, customer-furnished system ground applied to terminal DI8- activates the ESTOP function. The ESTOP function shuts down and locks out the rectifiers, opens the LVD’s, and shuts down the converters. When the ESTOP signal is removed, LVD’s close (if battery present) and converters restart. To restart the rectifiers; turn AC power to the rectifiers OFF, wait 30 seconds or more, then turn AC power to the rectifiers ON. Rectifiers can also be restarted via the Local and Web-interface ACU+ menus using the “rectifier reset” command.

LOCAL CONTROLS AND INDICATORS

Refer to the Controller, Rectifier, and Converter User Instructions for descriptions of the local controls and indicators located on these units.

Refer to this section for descriptions of the local controls and indicators located on the circuit cards installed inside the distribution cabinet.

Circuit Card Locations

Refer to Figure 2-1.

Chapter 2. Operating Procedures

Page 3

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 9
Contents UM581127000 Issue AB, March 22 User InstructionsSPEC. NO. Model 581127000 710NPBA Page Table of Contents Battery General SafetyVoltages AC Input Voltages DC Input/Output VoltagesCircuit Card Handling Static Warning Customer Documentation Package Bound System Installation ManualSystem Description USB Drive with All Customer DocumentationDistribution Cabinet Module Mounting AssemblyACU+ Advanced Control Unit Plus Controller Rectifier ModulesRefer to Figure Operating Procedures Local Controls and IndicatorsCONTROLLER, RECTIFIERS, and Optional Converters Estop FunctionIB2 Circuit Card Locations Operating ProceduresSystem Interface Circuit Card Optional LVD Driver Circuit Card Optional LVD Driver Circuit Card P/N Operating ProceduresOptional LVD Driver Lite Circuit Card Middle Position Normal Operation Optional Manual Battery Disconnect Circuit CardSystem Maintenance Procedures Installers connectionsMaintenance Procedures to be Performed at 6-Month Intervals Procedure User Instructions Issue AB, March 22 Spec. No Model 710NPBAInstalling a Field Expansion Module Mounting Assembly User Instructions Spec. No Model 710NPBA Communications Cables Maintenance Spec. No Model 710 Npba Issue AB, March 22Changing the ACU+ LVD Control Level for a Contactor System Troubleshooting Information ACU+ Controller ConfigurationTroubleshooting Alarm Conditions on the ACU+ Controller Contact InformationProcedure Clearing a Converter Lost Alarm Clearing a Rectifier Lost AlarmReplacement Procedures Replacement InformationReplacing a Rectifier or Converter Module Replacing the ACU+ ControllerDistribution Fuse Alarm Fuse Replacement Replacing a Distribution DeviceGeneral Fuseholder Assembly Replacing a TPS/TLS Fuse ProcedureReplacing a Bullet Nose Fuseholder Procedure Insert these terminals Replacing a Bullet Nose Circuit Breaker ProcedureInto corresponding sockets On distribution panelReplacing a TPH Fuse Procedure Replacing a TPL-B Fuse Troubleshooting and Repair Replacing a GJ/218 Circuit Breaker Procedure Installing Circuit Breaker Pole breaker shown Pole and 4-pole breakers similar List AC Only List BC Only Circuit Card Replacement Procedures Issue AB, March 22 Spec. No Model 710 NpbaSystem Interface Circuit Card Replacement Procedure UM581127000 TB2 Spec. No Model 710NPBA Issue AB, March 22 Relay Optional EIB Interface Board Assembly Top View SM-DU+ and Shunt Interface Assembly Replacement Procedure UM581127000 SM-DU+ Spec. No Model 710NPBA Issue AB, March 22 UM581127000 UM581127000 User Instructions Issue AB, March 22 Spec. No Model 710NPBA UM581127000 Replacing a Distribution Panel Procedure Removing the Distribution PanelInstalling the Distribution Panel Replacing a Distribution Panel Troubleshooting and Repair Procedure Removing the Contactor Replacing a Battery or Load Disconnect ContactorInstalling the Replacement Contactor Restarting the Power SystemWhite/Black Wire Spec. No Model 710 Npba Issue AB, March 22 Black Wire Load Disconnect LLP215523 New LLP216783 Misc. updates Revision Record Change Issue Number Description of ChangeDownload service & maintenance reports Online NetPerform Optimization ServicesFor More Information Answers technical product and system