Emerson 710NPBA manual Replacing a Bullet Nose Fuseholder Procedure

Page 27

User Instructions

UM581127000

Spec. No. 581127000 (Model 710NPBA)

Issue AB, March 22, 2012

 

 

 

 

 

 

 

 

 

Replacing a Bullet Nose Fuseholder

 

 

 

 

 

 

 

Procedure

 

 

Note: Refer to Figure 4-2as this procedure is performed.

1)Open the distribution cabinet’s front door by turning the latch in the counterclockwise position.

2)Remove the fuse carrier from the mounted fuseholder body by pulling it straight out.

3)Gently rock the defective fuseholder up and down while pulling firmly outward until the fuseholder is free from the distribution panel.

4)Orient the fuseholder as shown in Figure 4-2.Insert the terminals on the rear of the fuseholder into their corresponding sockets on the distribution panel. Ensure the alarm contact on the back of the fuseholder makes contact with the alarm terminal on the mounting circuit card. Push fuseholder in firmly until fully seated in the distribution panel.

5)Push the fuse carrier securely back into the mounted fuseholder body. Note that a polarizing key on the bottom of the carrier prevents the carrier from being inserted upside down.

6)Verify no Fuse Alarms are active.

7)Close the distribution cabinet’s front door. Turn the latch clockwise to secure the door.

Chapter 4. Troubleshooting and Repair

Page 21

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Image 27
Contents UM581127000 Issue AB, March 22 User InstructionsSPEC. NO. Model 581127000 710NPBA Page Table of Contents AC Input Voltages DC Input/Output Voltages General SafetyBattery VoltagesCircuit Card Handling Static Warning USB Drive with All Customer Documentation Bound System Installation ManualCustomer Documentation Package System DescriptionRectifier Modules Module Mounting AssemblyDistribution Cabinet ACU+ Advanced Control Unit Plus ControllerEstop Function Local Controls and IndicatorsRefer to Figure Operating Procedures CONTROLLER, RECTIFIERS, and Optional ConvertersIB2 Circuit Card Locations Operating ProceduresSystem Interface Circuit Card Optional LVD Driver Circuit Card Optional LVD Driver Circuit Card P/N Operating ProceduresOptional LVD Driver Lite Circuit Card Middle Position Normal Operation Optional Manual Battery Disconnect Circuit CardSystem Maintenance Procedures Installers connectionsMaintenance Procedures to be Performed at 6-Month Intervals Procedure User Instructions Issue AB, March 22 Spec. No Model 710NPBAInstalling a Field Expansion Module Mounting Assembly User Instructions Spec. No Model 710NPBA Communications Cables Maintenance Spec. No Model 710 Npba Issue AB, March 22Changing the ACU+ LVD Control Level for a Contactor Contact Information ACU+ Controller ConfigurationSystem Troubleshooting Information Troubleshooting Alarm Conditions on the ACU+ ControllerProcedure Clearing a Converter Lost Alarm Clearing a Rectifier Lost AlarmReplacing the ACU+ Controller Replacement InformationReplacement Procedures Replacing a Rectifier or Converter ModuleDistribution Fuse Alarm Fuse Replacement Replacing a Distribution DeviceGeneral Fuseholder Assembly Replacing a TPS/TLS Fuse ProcedureReplacing a Bullet Nose Fuseholder Procedure On distribution panel Replacing a Bullet Nose Circuit Breaker ProcedureInsert these terminals Into corresponding socketsReplacing a TPH Fuse Procedure Replacing a TPL-B Fuse Troubleshooting and Repair Replacing a GJ/218 Circuit Breaker Procedure Installing Circuit Breaker Pole breaker shown Pole and 4-pole breakers similar List AC Only List BC Only Circuit Card Replacement Procedures Issue AB, March 22 Spec. No Model 710 NpbaSystem Interface Circuit Card Replacement Procedure UM581127000 TB2 Spec. No Model 710NPBA Issue AB, March 22 Relay Optional EIB Interface Board Assembly Top View SM-DU+ and Shunt Interface Assembly Replacement Procedure UM581127000 SM-DU+ Spec. No Model 710NPBA Issue AB, March 22 UM581127000 UM581127000 User Instructions Issue AB, March 22 Spec. No Model 710NPBA UM581127000 Replacing a Distribution Panel Procedure Removing the Distribution PanelInstalling the Distribution Panel Replacing a Distribution Panel Troubleshooting and Repair Restarting the Power System Replacing a Battery or Load Disconnect ContactorProcedure Removing the Contactor Installing the Replacement ContactorWhite/Black Wire Spec. No Model 710 Npba Issue AB, March 22 Black Wire Load Disconnect LLP215523 New LLP216783 Misc. updates Revision Record Change Issue Number Description of ChangeAnswers technical product and system NetPerform Optimization ServicesDownload service & maintenance reports Online For More Information