Emerson Series 300 manual Index

Page 20

A

G

INDEX

strip heater, 5–5

accessories, 5–2, 5–5 auxiliary circuits, 1–2

B

battery, 4–2, 5–1 buttons, push, 3–1

bypass time delay, 1–5, 2–1, 3–1

C

cable lugs, 1–1 preparation, 1–1

catalog number, inside cover cleaning, 3–1

connections

engine control contact, 1–2 line, 1–1

contact position indicators, 1–3

contacts auxiliary, 1–2 engine control, 1–2 main, 1–3, 3–1

source availability signal, 5–2

control features, 5–1 load disconnect, 5–4 motor load transfer, 5–4 plant exerciser, 5–1, 5–2, 5–3

controller, 4–1, 4–2 codes, cover cover removal, 4–2 disconnecting, 3–1

time delay potentiometers, 4–2

D

DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–4

E

electrical operation, 1–5 engine exerciser, 5–1, 5–2, 5–3 engine starting contacts, 1–2

F

features, see control features

frequency, pickup and dropout settings, 4–1

functional test, 1–3, 1–4, 1–5

ground, controller, 1–1

H

handle, maintenance, 1–3 warning, 1–3

harness, 1–2 disconnect plugs, 3–1

HELP 800–800–2726 (ASCO) customercare@asco.com

I

inphase monitor, 5–4 inspection, 3–1 installation, 1–1

L

labels,

engine starting contacts, 1–2 inputs / outputs, 1–2 rating, cover

lights, 1–4, 5–1

load disconnect feature, 5–4 lubrication, 3–1

M

maintenance, preventive, 3–1

manual load transfer, 3–2 warning, 3–2

manual operation, 1–3 warning, 1–3

motor load transfer feature, 5–4

N

nameplate, cover

O

operation electrical, 1–5 manual, 1–3

illustration of, 1–3 warning, 1–3

sequence of, 2–1

optional accessories programmable engine exerciser

&source availability signal contacts, 5–2, 5–3

serial communication module, 5–5

P

parts, 3–1 problem, 3–2

programmable engine exerciser, 5–2, 5–3

R

rating label, cover

remote control features, 5–4 bypass transfer time delay, 5–4 inhibit transfer to emergency, 5–4 remote test, 5–4

remote transfer to emergency, 5–4 replacement parts, 3–1

S

service, call 800–800–2726 (ASCO) set engine exerciser, 5–1, 5–2, 5–3

settings changing, 4–1 factory, 4–1 frequency, 4–1 phase, 4–1 time delay, 4–1 voltage, 4–1

source accepted lights, 1–4, 1–5

T

terminal block, 1–2

test, functional, 1–3, 1–4, 1–5

time delay adjustment, 4–1 gen–set cooldown, 4–1 how to change, 4–2

override momentary outages, 4–1 transfer to emergency, 4–1 transfer to normal, 4–1

timer (plant exerciser), how to set, 5–1, 5–2, 5–3

transfer switch position lights, 1–4, 1–5

transfer test, 1–5, 3–1 trouble–shooting, 3–2

V

voltage, phase, 4–1

voltage, pickup and dropout settings, 4–1

Printed in U.S.A.

Copyright --- ASCO Power Technologies, L.P. 2007

 

Image 20
Contents Operator’s Manual Nameplate Catalog Number Identification 600 800 1000 1200Rating Label Controller Membrane controlsPage Installation SectionInstallation Engine Starting ContactsAuxiliary Circuits Connections to ControllerManual Operation Test Installation Functional TestATS Position Handle Indicators Voltage Checks Electrical Operation Close the enclosure door firstSequence of Operation Transfer To EmergencyDisconnecting the Controller Testing & ServicePreventive Maintenance Testing & Service TROUBLE-SHOOTINGProceed with care Automatic transfer switch is energized Manual Load TransferAdjustments Time Delay AdjustmentSensor Adjustments Time Delay SettingsClose the enclosure door AdjustmentsHow to Change a Setting Control Features Engine Exercisers DIP Switch SettingsHow to Set Built-In Timer BUILT-IN Engine ExerciserControl Features Programmable Engine Exerciser ModuleDaylight Savings Time Adjust Display Fast / Slow Adjust DisplayFill in your settings for future reference Navigating the MenuLoad Disconnect Feature Remote Control FeaturesInphase Monitor For Motor Load Transfer Control Features Optional Strip Heater Accessory Strip Heater AccessoryAvailable Kits from Asco ControlsIndex