Napoleon Fireplaces GD82PT-T, GD82NT-T Using Rigid Vent Components, Fireplace Vent Connection

Page 12

12

FIREPLACE VENT CONNECTION

1.Install the 4” diameter aluminium fl exible liner to the

replace. Secure with 3 screws and fl at washers. Seal the

joint and screw holes using the high temperature sealant

FIGURE 20

(W573-0007 not provided).

 

2.Install the 7” diameter aluminium fl exible liner to the

replace. Attach and seal the joints.

USING RIGID VENT COMPONENTS

The vent system must be supported approximately every 3 feet for both vertical and horizontal runs. Use Wolf Steel vent spacers or equivalent every 3 feet and either side of each elbow to maintain the minimum 1¼” clearance between the outer and inner vent pipes. Use Wolf Steel support ring as- sembly or equivalent noncombustible strapping to maintain the minimum clearance to combustibles for both vertical and horizontal runs.

All inner exhaust and outer intake vent pipe joists may be sealed using either Red RTV high temp silicone sealant or Black high temp Mill Pac with the exception of the fireplace exhaust flue collar which must be sealed using Mill Pac (not supplied).

HORIZONTAL AIR TERMINAL INSTALLATION

1. Move the fire-

 

FIGURE 21

place into position.

 

CAULKING

#10x2½"

 

Measure the vent

 

SCREWS

CAULKING

length required

 

 

7" PIPE

between terminal

 

4" PIPE

 

 

and fi replace tak-

 

2" OVERLAP

ing into account

 

HI-TEMP

the additional

 

SEALANT

 

 

length needed for

 

HI-TEMP

 

SEALANT

the finished wall

 

 

surface and any

 

 

1¼” overlaps between venting components.

2. Apply high temperature sealant (W573-0007 not pro-

vided) to the outer edge of the 4” inner collar of the fireplace.

Attach the first vent component and secure using 3 self

EXTENDED HORIZONTAL AIR TERMINAL

INSTALLATION

1. Follow the instructions

FIGURE 22

for “Horizontal Air Terminal AIR TERMINAL

 

Installations”, items 1 to 3.

TELESCOPIC SLEEVE

 

2.Continue adding com- ponents alternating inner

20"

and outer venting. Ensure COUPLER

that all 4” venting and elbowsVENTING have suffi cient vent spacers

attached and each compo- nent is securely fastened to the one prior. Attach the 4” telescopic sleeve to the vent run.

Repeat using a 7” telescopic sleeve. Secure and seal as before. To facilitate completion, attach 4” and 7” couplers to the air terminal.

3.Install the air terminal. See item 3 of the Horizontal Air Terminal Installation. Extend the 4” telescopic sleeve; con- nect to the air terminal assembly. Fasten with self tapping screws and seal. Repeat using the 7” telescopic sleeve.

VERTICAL VENTING INSTALLATION

1.Move the fi replace into position.

2.Fasten the roof support to the roof using the screws pro- vided. The roof support is optional. In this case the venting is to be adequately supported using either an alternate method suitable to the authority having jurisdiction or the optional roof support.

tapping screws. Repeat using 7” piping.

3. Holding the air terminal (with the air defl ectors to the

top and the lettering in an upright, readable position) insert

the terminal into both vent pipes with a twisting motion to

ensure that both the terminal sleeves engage into the vent

pipes and sealant. Secure the terminal to the exterior wall and

make weather tight by sealing with caulking (not supplied).

W415-0583 / D / 07.24.07

3.Apply high temperature seal- ant to the outer edge of the inner sleeve of the air terminal. Slip a 4” diameter coupler a minimum of 2” over the sleeve and secure using 3 screws.

4. Apply high temperature seal- ant to the outer edge of the of the outside sleeve of the air terminal. Slip a 7” diameter coupler over the sleeve and secure as before. Trim the 7” coupler even with the 4” coupler end.

5. Thread the air terminal pipe assembly down through the roof support and attach, ensuring that a minimum 16” of air terminal will penetrate the roof when fastened. The air terminal must be located vertically and plumb.

FIGURE 23

VENT

PIPE

COLLAR

VENT PIPE

SHIELD

FIGURE 24

Image 12 Contents
Installation Operation Instructions Table of Contents Napoleon GAS Fireplace PRESIDENT’S Lifetime Limited Warranty General Instructions General InformationVenting Care of GlassVenting Lengths & AIR Terminal Locations TOP Exit / Horizontal Termination DefinitionsElbow Vent Length Values HT + VT= 10.7 + 6 =16.7 VT = 4.2 x 6 = 25.2 ftSince both formulas are met, this vent confi guration is ac CeptableTOP Exit Vertical Termination TOP Vertical TerminationW415-0583 / D Installation Wall and Ceiling Protection Vertical Installation Horizontal InstallationUsing Flexible Vent Components Horizontal AIR Terminal InstallationVertical AIR Terminal Installation Using Rigid Vent Components Vertical Venting InstallationExtended Horizontal AIR Terminal Installation Fireplace Vent ConnectionGAS Installation Mobile Home InstallationRestricting Vertical Vents Framing Clearance to CombustiblesHard Wiring Connection Electrical SchematicElectrical Connection Mantle ClearancesFinishing / Servicing BOWL, Mesh & Rock Replacement Burner Base RemovalBlower Replacement Battery ReplacementTurn off the power to the fi replace Turn off the gas valve Night Lighttm Replacement Operation / MaintenanceTime OUT Fireplace OperationHand Held Remote Operations Flame HeightFAN Speed Setting Address Setting Procedure DIP Switch Number 0 = on / 1 = OFF Operating Instructions What to do if YOU Smell GASLighting Instructions To Turn OFF GASAdjustments MaintenancePilot Burner Adjustment Flame CharacteristicsVenturi Adjustment Conversion KITClosing the air shutter Replacements 000 Trouble Shooting Guide Symptom Problem Test SolutionPilot goes out while Gas piping is undersized Standing MainBurner is in ‘OFF’ Supply working pressure Position Fireplace Service History W415-0583 / D
Related manuals
Manual 31 pages 39.69 Kb