Fujitsu XG2600 Space Requirements, Installation Requirements, Check-list, Check Item Check Result

Page 28

XG2600 Hardware Guide

Chapter 2 Installation

 

 

Installation Requirements

The product is specifically designed for rack-mounting.

Check-list

Check the following items.

Check Item

Check Result

 

 

Nothing is put on the switch.

Vents are not obstructed.

The switch is not located on the table or not stuck on another switch.

The switch is not located under direct sunshine, near heating appliance, under high humidity or in a dusty area..

The switch is not located on unstable places where vibrating, or tilting.

"For Safe Use of the Product" has been thoroughly read Reference (pg.8)

2.1.2Space Requirements

When installing the switch and providing maintenance, ensure the space below is maintained.

Ensuring the Space for Installation (Maintenance) of the Switch

Internal cooling fans of the switch allow the air intake and exhaust performed at both at the Interface Side and Fan Unit Side. Ensure the indicated space below and do not put anything which avoids airflow.

800mm

Back space for the maintenance

rack

300mm or more

Space for the maintenance/ installation

150mm or more

XG2600

90mm or more

800mm

300mm or more

Space for the maintenance/ installation

19" rack Depth

Front space for the maintenance

19" rack Width

28

Requirements for Installation Environment

Image 28
Contents XG2600 Xxxx-xxxx-xxxxPreface Contents Connecting a Setup PC About the Symbols Organization and Usage of This ManualAbout This Manual Target Readers and Required KnowledgeAbbreviated Product Names Trademark Notification in This ManualProduct name Description in this manual How the Manuals for This Device Are Organized Manual Name DescriptionSymbols Definitions Safety PrecautionsAbout Warning Descriptions If you notice abnormal conditions such as Failure to follow this may cause damage to Precautions for Use Ensuring SecurityCleaning SafetyHigh safety Static electricityLaser safety About Our Green ProductsXG2600 Hardware Guide Chapter Getting Started Parts List Items in the Package / Names and FunctionsCD-ROM Switch Fan Unit Side LED DetailsLED Functions/Behaviors LED Name Light StatusSwitch Interface Side SR/10GBASE-LRPrecautions FDX LEDSFP+ LINK/ACT Top Surface How to attach Cable Holder Cable Restraints with Tyraps Attach Cable Holder to the switch firstOption 1 SFP+ ModuleInstall ation Requirements for Installation Environment Installation RequirementsTemperature and Humidity Requirements Power RequirementsInstallation Requirements Space RequirementsCheck-list Check Item Check ResultDecide Switch Access Configuration Installation of the switchRear-Access Configuration Factory Default PSU2 Slot PSU1 Slot IntakeSlot 1/Slot Side Fan Unit SideFront-Access Configuration User Configured Airflow ExhaustDecide positions for rack mounting brackets Rear-Access Configuration Factory DefaultDecide positions of rack mounting brackets Install the switch in a 19 rack Fix rack mounting rails to the rack postsM6 Machine Screws Change the direction of fans to adjust airflow Remove rack mounting bracketsRemove fans Loosen two screws to remove fan unitChange direction of fans Fix fans Remove screws and take off PSU units on the Interface Side XG2600 Hardware Guide Installation Attach rack mounting brackets to the switch Connecting the Equipment Discharging Twisted Pair CableCleaning SFP+ Module / Optical Connector Cleaning of SFP+ ModuleCleaning of Optical Connector Blow dust away with cleanly dry air or nitrogenRemoval of Micro Dust Connecting Twisted Pair Cable / SFP+ Module Connecting Twisted Pair CableConnecting SFP+ Module Make the replacing SFP+ slot to the disable status Replacing SFP+ ModuleType Core/Cladding Diameter Cable Length m# online ether port Check and confirm that USB port is in a disable status Plugging in the USB MemoryPlug in the USB Memory Replacing the USB Memory UnplugNecessary Hardware / Software Connecting a Setup PCConnect RS232C Cable Turn on the Power # clear logging errorPress Return key or Enter key Precautions Prepare a Setup PCSetup Items Confirm # is shown on screen Time Setting コマンドSet up IP address Command When connecting through10GBASE-R SFP+ portIndex Flash LEDXG2600 Hardware Guide Index XG2600 Hardware Guide