P74290ea_F1DExxxC_man.qxd
INSTALLATION
DIP Switch Configuration Chart
| N° DU COMMUTATEUR DIP |
| ADRESSE BANK | |||
1 | 2 | 3 |
| 4 | ||
|
| |||||
|
|
|
|
|
|
|
BAS |
| BAS | BAS |
| BAS | BANK 00 (valeur par défaut) |
|
|
|
|
|
|
|
HAUT |
| BAS | BAS |
| BAS | BANK 01 PRIMAIRE/SECONDAIRE |
|
|
|
|
|
|
|
BAS |
| HAUT | BAS |
| BAS | BANK 02 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| HAUT | BAS |
| BAS | BANK 03 SECONDAIRE |
|
|
|
|
|
|
|
BAS |
| BAS | HAUT |
| BAS | BANK 04 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| BAS | HAUT |
| BAS | BANK 05 SECONDAIRE |
|
|
|
|
|
|
|
BAS |
| HAUT | HAUT |
| BAS | BANK 06 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| HAUT | HAUT |
| BAS | BANK 07 SECONDAIRE |
|
|
|
|
|
|
|
BAS |
| BAS | BAS |
| HAUT | BANK 08 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| BAS | BAS |
| HAUT | BANK 09 SECONDAIRE |
|
|
|
|
|
|
|
BAS |
| HAUT | BAS |
| HAUT | BANK 10 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| HAUT | BAS |
| HAUT | BANK 11 SECONDAIRE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BAS |
| BAS | HAUT |
| HAUT | BANK 12 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| BAS | HAUT |
| HAUT | BANK 13 SECONDAIRE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BAS |
| HAUT | HAUT |
| HAUT | BANK 14 SECONDAIRE |
|
|
|
|
|
|
|
HAUT |
| HAUT | HAUT |
| HAUT | BANK 15 SECONDAIRE |
|
|
|
|
|
|
|
Example:
Four OmniView ENTERPRISE
Installation
Before you begin:
1.Make sure that all computers and switches are powered off and that each Switch has been assigned a unique BANK address.
2.Place primary and secondary Switches in the desired locations.
INSTALLATION
3.Connect the console monitor, keyboard, and mouse to the console ports of the primary Switch(es), as previously described for standalone units, skipping steps 5 and 6.*
Hosts 1 & 2 |
| Hosts 3 & 4 |
| Hosts 5 & 6 |
| Hosts 7 & 8 |
|
|
|
|
|
|
|
Hosts 1 & 2 |
| Hosts 3 & 4 |
| Hosts 5 & 6 |
| Hosts 7 & 8 |
|
|
|
|
|
|
|
4.Connect the computers to the Switch as previously described for standalone Switches.
Hosts 1 & 2 | Hosts 3 & 4 | Hosts 5 & 6 | Hosts 7 & 8 |
Hosts 1 & 2 | Hosts 3 & 4 | Hosts 5 & 6 | Hosts 7 & 8 |
14 | 15 |