Cisco Systems N6004SBUNP1L, N6KC600496Q, N6001SBUNP1, N6000, N6KC600164P manual Grounding the Switch

Page 25

Chapter 2 Installing the Cisco Nexus 6000 Series Switches

Grounding the Switch

Se n d d o c u m e n t a t i o n c o m m e n t s t o n ex u s 5 k d o c s @ c i s c o . c o m .

Figure 2-1

Slider Rails

c.Holding the chassis level, insert two screws (12-24 or 10-32, depending on the rack type) through the cage nuts and the holes in one of the front rack-mount brackets and into the threaded holes in the rack-mounting rail.

d.Repeat for the other front rack-mount bracket on the other side of the switch.

Grounding the Switch

This section describes the need for system grounding for all of the Cisco Nexus 6004 switch and explains how to prevent damage from electrostatic discharge.

This section includes the following topics:

Proper Grounding Practices, page 2-8

Preventing Electrostatic Discharge Damage, page 2-9

Establishing the System Ground, page 2-11

Required Tools and Equipment, page 2-11

Grounding the Cisco Nexus 6000 Series Chassis, page 2-11

Grounding the Cisco Nexus 6000 Series Chassis, page 2-24

Cisco Nexus 6000 Series Hardware Installation Guide

 

OL-15902-01

2-7

 

 

 

Image 25
Contents Americas Headquarters Cisco Nexus 6000 Series Hardware Installation GuidePage Audience PrefaceOrganization Chapter and Title DescriptionBewaar Deze Instructies ConventionsAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Viii Preface Related Documentation Obtaining Documentation and Submitting a Service RequestFeatures Cisco Nexus 6004 SwitchOverview Chassis Front View of the Cisco Nexus 6004 switchExpansion Modules Rear View of the Cisco Nexus 6004 SwitchCisco Nexus 6004 Expansion Module PortsPart Number Power Supply Power SupplyFan Module Airflow Cisco SFP Description TransceiversOverview Cisco Nexus 6004 Switch Installing the Cisco Nexus 6000 Series Switches Installation Options with Racks and Cabinets Preparing for InstallationChassis Weight Installation GuidelinesPage Required Equipment Unpacking and Inspecting the SwitchInstalling a Cisco Nexus 6004 switch Installing the SwitchQuantity Part Description Cisco Nexus 6000 Series Hardware Installation Guide Grounding the Switch Environment Severity Level Grounding Recommendations Proper Grounding PracticesPreventing Electrostatic Discharge Damage OL-15902-01 Required Tools and Equipment Establishing the System GroundGrounding the Cisco Nexus 6000 Series Chassis Starting the Switch Statement Cisco Nexus 6000 Series Hardware Installation Guide Connecting the Switch Preparing for Network Connections Connecting to the Console PortConnecting to an Ethernet Port Connecting to the Ethernet Connector PortInstalling and Replacing Transceivers Installing a TransceiverReplacing a Transceiver Installing a Cable into an Transceiver Installing Cables into TransceiversReplacing a Cable for a Transceiver Connecting the Switch Connecting to an Ethernet Port Replacing Expansion Modules Replacing ComponentsRemoving a LEM Replacing LEMsInstalling a Module Installing a LEMReplacing Modules Removing a ModuleRemoving a Power Supply Replacing or Installing Power SuppliesInstalling a Power Supply Wiring a DC Power Connector Wiring the DC Power Connector Replacing a Fan Module Installing a Fan ModuleRemoving a Fan Module Removing the Cisco Nexus 6000 Platform Chassis Cabinet and Rack Requirements Cabinet and Rack InstallationGeneral Requirements for Cabinets and Racks Requirements Specific to Perforated Cabinets Cable Management GuidelinesSwitch Specifications Technical SpecificationsEnvironmental Specifications Description SpecificationPower Specifications Expansion Module SpecificationsSpecifications for the Cisco Nexus 6004 Power Supply Property Cisco Nexus 6004SwitchAppendix B Technical Specifications Appendix B Technical Specifications Cable RJ-45 Connector Pinouts Cable and Port SpecificationsSignal Name P1, P1-45 Pins P2, DB-9 Pins Console Port Supported Power Cords and PlugsLength Description Feet Meters IllustrationCAB-N5K6A-NA CAB-9K10A-AU Plug CAB-9K10A-SW CAB-C13-CBN Figure C-14 Jumper Power CordLEDs Indicator Location Function Color Status StateChassis and Module LED Descriptions Power Supply Condition Green Amber Conditions Indicated by the Power Supply LEDsPort LEDs Ethernet and Fibre Channel LEDs Ethernet Port LEDsStatus Description Link State LED StateAppendix D LEDs Port LEDs Switch Hardware Best Practices Troubleshooting Hardware ComponentsOverview Installation Best Practices Power Supply ConditionsSwitch Operation Best Practices Power Supply Condition Power LED Status Fail LED StatusPage Cisco Nexus 6000 Series Hardware Installation Guide Cisco Nexus 6004 Switch Accessory Kit Accessory KitsOL-15902-02-xx Site Preparation Checklist Site Planning and Maintenance RecordsTask No Planning Activity Verified By Time Date Contact and Site Information Slot Module Type Module Serial Number Supervisor Chassis and Module Information
Related manuals
Manual 204 pages 40.67 Kb