Cabinet and Rack Installation

This appendix provides the requirements for cabinet and rack installation for the Cisco Nexus 6004 switch and includes the following sections:

Cabinet and Rack Requirements, page A-1

Cable Management Guidelines, page A-2

Cabinet and Rack Requirements

This section provides the requirements for the following types of cabinets and racks, assuming an external ambient air temperature range of 0 to 104oF (0 to 40oC):

Standard perforated cabinets

Standard open racks

Note If you are selecting an enclosed cabinet, we recommend one of the thermally validated types: standard perforated or solid-walled with a fan tray.

Note Do not use racks that have obstructions (such as power strips), because the obstructions could impair access to field-replaceable units (FRUs).

This section includes the following topics:

General Requirements for Cabinets and Racks, page A-1

Requirements Specific to Perforated Cabinets, page A-2

General Requirements for Cabinets and Racks

The cabinet or rack must be one of the following types:

Standard 19-in. (48.3 cm) (four-post EIA cabinet or rack, with mounting rails that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992. See the “Requirements Specific to Perforated Cabinets” section on page A-2.

The cabinet or rack must also meet the following requirements:

The minimum vertical rack space for the Cisco Nexus 6004 chassis must be four RU (rack units).

Cisco Nexus 6000 Series Hardware Installation Guide

 

OL-15902-02

A-1

 

Image 47
Contents Americas Headquarters Cisco Nexus 6000 Series Hardware Installation GuidePage Chapter and Title Description PrefaceAudience OrganizationBewaar Deze Instructies ConventionsAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Viii Preface Related Documentation Obtaining Documentation and Submitting a Service RequestOverview Cisco Nexus 6004 SwitchFeatures Chassis Front View of the Cisco Nexus 6004 switchExpansion Modules Rear View of the Cisco Nexus 6004 SwitchCisco Nexus 6004 Expansion Module PortsFan Module Power SupplyPart Number Power Supply Airflow Cisco SFP Description TransceiversOverview Cisco Nexus 6004 Switch Installing the Cisco Nexus 6000 Series Switches Installation Guidelines Preparing for InstallationInstallation Options with Racks and Cabinets Chassis WeightPage Required Equipment Unpacking and Inspecting the SwitchQuantity Part Description Installing the SwitchInstalling a Cisco Nexus 6004 switch Cisco Nexus 6000 Series Hardware Installation Guide Grounding the Switch Environment Severity Level Grounding Recommendations Proper Grounding PracticesPreventing Electrostatic Discharge Damage OL-15902-01 Grounding the Cisco Nexus 6000 Series Chassis Establishing the System GroundRequired Tools and Equipment Starting the Switch Statement Cisco Nexus 6000 Series Hardware Installation Guide Connecting the Switch Preparing for Network Connections Connecting to the Console PortInstalling a Transceiver Connecting to the Ethernet Connector PortConnecting to an Ethernet Port Installing and Replacing TransceiversReplacing a Transceiver Replacing a Cable for a Transceiver Installing Cables into TransceiversInstalling a Cable into an Transceiver Connecting the Switch Connecting to an Ethernet Port Replacing Expansion Modules Replacing ComponentsRemoving a LEM Replacing LEMsRemoving a Module Installing a LEMInstalling a Module Replacing ModulesInstalling a Power Supply Replacing or Installing Power SuppliesRemoving a Power Supply Wiring a DC Power Connector Wiring the DC Power Connector Removing a Fan Module Installing a Fan ModuleReplacing a Fan Module Removing the Cisco Nexus 6000 Platform Chassis General Requirements for Cabinets and Racks Cabinet and Rack InstallationCabinet and Rack Requirements Requirements Specific to Perforated Cabinets Cable Management GuidelinesDescription Specification Technical SpecificationsSwitch Specifications Environmental SpecificationsProperty Cisco Nexus 6004Switch Expansion Module SpecificationsPower Specifications Specifications for the Cisco Nexus 6004 Power SupplyAppendix B Technical Specifications Appendix B Technical Specifications Signal Name P1, P1-45 Pins P2, DB-9 Pins Cable and Port SpecificationsCable RJ-45 Connector Pinouts Description Feet Meters Illustration Supported Power Cords and PlugsConsole Port LengthCAB-N5K6A-NA CAB-9K10A-AU Plug CAB-9K10A-SW CAB-C13-CBN Figure C-14 Jumper Power CordChassis and Module LED Descriptions Indicator Location Function Color Status StateLEDs Port LEDs Conditions Indicated by the Power Supply LEDsPower Supply Condition Green Amber Link State LED State Ethernet Port LEDsEthernet and Fibre Channel LEDs Status DescriptionAppendix D LEDs Port LEDs Overview Troubleshooting Hardware ComponentsSwitch Hardware Best Practices Power Supply Condition Power LED Status Fail LED Status Power Supply ConditionsInstallation Best Practices Switch Operation Best PracticesPage Cisco Nexus 6000 Series Hardware Installation Guide Cisco Nexus 6004 Switch Accessory Kit Accessory KitsOL-15902-02-xx Site Preparation Checklist Site Planning and Maintenance RecordsTask No Planning Activity Verified By Time Date Contact and Site Information Slot Module Type Module Serial Number Supervisor Chassis and Module Information