Cisco Systems N6KC600164P Connecting to the Ethernet Connector Port, Installing a Transceiver

Page 35

Chapter 3 Connecting the Switch

Connecting to the Ethernet Connector Port

Se n d d o c u m e n t a t i o n c o m m e n t s t o n ex u s 5 k d o c s @ c i s c o . c o m .

Connecting to the Ethernet Connector Port

Caution To prevent an IP address conflict, do not connect the management port to the network until the initial configuration is complete. For configuration instructions, see the Cisco Nexus 6000 Series CLI Configuration Guide.

This section describes how to connect the Ethernet connector port to an external hub, switch, or router. The Ethernet connector port has an RJ-45 interface. To connect the Ethernet connector port to an external hub, switch, or router, follow these steps:

Step 1 Connect the appropriate modular cable to the Ethernet connector port:

Use modular, RJ-45, straight-through UTP cables to connect the Ethernet connector port to an Ethernet switch port or hub.

Use a cross-over cable to connect to a router interface.

Step 2 Connect the other end of the cable to the device.

Connecting to an Ethernet Port

To connect to an Ethernet port, you must install transceivers and connect them with optical cables.

This section includes the following topics:

Installing and Replacing Transceivers, page 3-3

Installing Cables into Transceivers, page 3-5

Installing and Replacing Transceivers

Caution Excessively removing and installing a transceiver can shorten its life. Unless it is absolutely necessary, do not remove and insert transceivers. To prevent damage to the cable and transceiver, we recommend that you disconnect cables before installing or removing transceivers.

This section includes the following topics:

Installing a Transceiver, page 3-3

Replacing a Transceiver, page 3-4

Installing a Transceiver

To install a transceiver, follow these steps:

Step 1 Attach an ESD-preventive wrist strap and follow its instructions for use.

Cisco Nexus 6000 Series Hardware Installation Guide

 

OL-15902-01

3-3

 

 

 

Image 35
Contents Americas Headquarters Cisco Nexus 6000 Series Hardware Installation GuidePage Chapter and Title Description PrefaceAudience OrganizationBewaar Deze Instructies ConventionsAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Viii Preface Related Documentation Obtaining Documentation and Submitting a Service RequestOverview Cisco Nexus 6004 SwitchFeatures Chassis Front View of the Cisco Nexus 6004 switchExpansion Modules Rear View of the Cisco Nexus 6004 SwitchCisco Nexus 6004 Expansion Module PortsFan Module Power SupplyPart Number Power Supply Airflow Cisco SFP Description TransceiversOverview Cisco Nexus 6004 Switch Installing the Cisco Nexus 6000 Series Switches Installation Guidelines Preparing for InstallationInstallation Options with Racks and Cabinets Chassis WeightPage Required Equipment Unpacking and Inspecting the SwitchQuantity Part Description Installing the SwitchInstalling a Cisco Nexus 6004 switch Cisco Nexus 6000 Series Hardware Installation Guide Grounding the Switch Environment Severity Level Grounding Recommendations Proper Grounding PracticesPreventing Electrostatic Discharge Damage OL-15902-01 Grounding the Cisco Nexus 6000 Series Chassis Establishing the System GroundRequired Tools and Equipment Starting the Switch Statement Cisco Nexus 6000 Series Hardware Installation Guide Connecting the Switch Preparing for Network Connections Connecting to the Console PortInstalling a Transceiver Connecting to the Ethernet Connector PortConnecting to an Ethernet Port Installing and Replacing TransceiversReplacing a Transceiver Replacing a Cable for a Transceiver Installing Cables into TransceiversInstalling a Cable into an Transceiver Connecting the Switch Connecting to an Ethernet Port Replacing Expansion Modules Replacing ComponentsRemoving a LEM Replacing LEMsRemoving a Module Installing a LEMInstalling a Module Replacing ModulesInstalling a Power Supply Replacing or Installing Power SuppliesRemoving a Power Supply Wiring a DC Power Connector Wiring the DC Power Connector Removing a Fan Module Installing a Fan ModuleReplacing a Fan Module Removing the Cisco Nexus 6000 Platform Chassis General Requirements for Cabinets and Racks Cabinet and Rack InstallationCabinet and Rack Requirements Requirements Specific to Perforated Cabinets Cable Management GuidelinesDescription Specification Technical SpecificationsSwitch Specifications Environmental SpecificationsProperty Cisco Nexus 6004Switch Expansion Module SpecificationsPower Specifications Specifications for the Cisco Nexus 6004 Power SupplyAppendix B Technical Specifications Appendix B Technical Specifications Signal Name P1, P1-45 Pins P2, DB-9 Pins Cable and Port SpecificationsCable RJ-45 Connector Pinouts Description Feet Meters Illustration Supported Power Cords and PlugsConsole Port LengthCAB-N5K6A-NA CAB-9K10A-AU Plug CAB-9K10A-SW CAB-C13-CBN Figure C-14 Jumper Power CordChassis and Module LED Descriptions Indicator Location Function Color Status StateLEDs Port LEDs Conditions Indicated by the Power Supply LEDsPower Supply Condition Green Amber Link State LED State Ethernet Port LEDsEthernet and Fibre Channel LEDs Status DescriptionAppendix D LEDs Port LEDs Overview Troubleshooting Hardware ComponentsSwitch Hardware Best Practices Power Supply Condition Power LED Status Fail LED Status Power Supply ConditionsInstallation Best Practices Switch Operation Best PracticesPage Cisco Nexus 6000 Series Hardware Installation Guide Cisco Nexus 6004 Switch Accessory Kit Accessory KitsOL-15902-02-xx Site Preparation Checklist Site Planning and Maintenance RecordsTask No Planning Activity Verified By Time Date Contact and Site Information Slot Module Type Module Serial Number Supervisor Chassis and Module Information
Related manuals
Manual 204 pages 40.67 Kb