Cabletron Systems 9H532-24, 9H531-24 manual Installing the Module into the SmartSwitch 9000 Chassis

Page 24

Installing the SmartSwitch 9000 Module

Using DIP Switch 6

The purpose of DIP switch 6 is to force a Flash download from a BootP server through the EM-EPIM. The Þrst step in this process is to conÞgure the BootP server. ConÞgurations of BootP servers can differ from platform to platform and from one operating system to another. Read the userÕs manual on BootP and TFTP serving for the correct Þles to edit and the correct Þles to execute for the server. After conÞguration of the BootP server the module can then have the switch state changed on dip switch 6 to initiate BootP and TFTP requests.

When the state of dip switch 6 is changed, the module begins requesting a BootP server in an attempt to receive a Flash image download. The modules boot PROM initiates a BootP sequence. During this sequence, the module requests an IP address and a Þlename from the BootP server. The module then requests a TFTP of the Þle and receives the download of the image. The module will not function until the Flash image is downloaded from the BootP and TFTP server.

If a BootP and TFTP are not intended at this time, this process may be stopped by resetting the module. Resetting is done by pushing the reset button on the module, power cycling the chassis, or removing the module from the chassis and re-inserting. (See the section titled The Reset Switch on page 2-6.)After resetting, the module again looks for a BootP server, but will time-out after about four minutes. After the time-out, the module boots from Flash memory. The next time the power is cycled, the module will boot from Flash memory and not request the BootP server.

Installing the Module into the SmartSwitch 9000 Chassis

To install the SmartSwitch 9000 module, follow the steps below:

NOTE

The INB Terminator Modules must be installed on the rear of the fourteen slot chassis before powering up this module. The INB Terminator Modules are not required on the six slot chassis. Refer to the INB Terminator Modules Installation Guide for information and installation procedure.

1.Remove the blank panel covering the two slots in which the module is being installed. All other slots must be covered, if other modules are not being installed, to ensure proper airßow and cooling.

2.Attach one end of the ESD wrist strap packaged with the SmartSwitch 9000 chassis to your wrist. Plug the other end into the ESD Wrist Strap Grounding receptacle in the lower right corner of the SmartSwitch 9000 chassis shown in Figure 2-2.

2-4

Image 24
Contents 9033050-02 Page FCC Notice Cabletron SYSTEMS, INC Program License Agreement Iii Cabletron Systems Limited Program License Agreement Page Page Declaration of Conformity Viii Contents Contents Features IntroductionIntroduction Auto-Negotiation Management Broadcast Suppression Priority Indicator Transmit Queue Switching Options Related Manuals Introduction User Accessible Components Unpacking the ModuleInstalling the SmartSwitch 9000 Module Switch Function Description Installing the Module into the SmartSwitch 9000 Chassis Using DIP SwitchInstalling the Module Reset Switch Reset SwitchCabling Requirements 10BASE-T Network100BASE-TX Network 100BASE-FX NetworkInstalling the SmartSwitch 9000 Module SmartSwitch Architecture Technical OverviewSystem Management Buses Technical OverviewSystem Diagnostic Controller SMB-1 BusSMB-10 Bus DC/DC Converter INB InterfaceI960 Core LED Mode Switch Lanview LEDsLanview LEDs Functions of the INB transmit LED are listed in Table Functions of the INB receive LED are listed in Table DPX Status LEDs 9H532-24 only Lanview LEDs Specifications Technical SpecificationsService Regulatory CompliancePhysical