Cabletron Systems SEHI-34, SEHI-22, SEHI-32, SEHI-24 manual FCC Notice, DOC Notice

Page 3

NOTICE

FCC NOTICE

This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment uses, generates, and can radiate radio frequency energy and if not installed in accordance with the operator’s manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause interference in which case the user will be required to correct the interference at his own expense.

WARNING: Changes or modifications made to this device which are not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.

DOC NOTICE

This digital apparatus does not exceed the Class A limits for radio noise emissions from digital apparatus set out in the Radio Interference Regulations of the Canadian Department of Communications.

Le présent appareil numérique n’émet pas de bruits radioélectriques dépassant les limites applicables aux appareils numériques de la class A prescrites dans le Règlement sur le brouillage radioélectrique édicté par le ministère des Communications du Canada.

ii

Image 3
Contents 10BASE-T Intelligent Stackable HUB USER’S Guide Printed On Recycled Paper DOC Notice FCC NoticeCabletron Software Program License Cabletron SYSTEMS, INC Program License AgreementUnited States Government Restricted Rights Exclusion of Warranty Disclaimer of LiabilityTable of Contents Local Management InstallationConnecting to the Network TroubleshootingContents Appendix B Twisted Pair Wiring Tables A-1 Chapter Introduction Using this ManualSehi Overview Introduction Getting HelpFlash EEPROMs Sehi FeaturesRepeater Functionality Polarity Detection and CorrectionStackable Capabilities Reset ButtonLanview LEDs Local ManagementEpim Introduction Optional FeaturesDaughter Board Upgrade Kit Rack Mount or Wall Mount HardwareRelated Manuals HubSTACK Interconnect Cable Requirements Cable SpecificationsJitter LengthInsertion Loss ImpedanceNoise DelayTemperature CrosstalkCable Type Attenuation Maximum Cable Length Fiber Optic Budget and Propagation DelayInstallation REQUIREMENTS/SPECIFICATIONS Terminators ConnectorsThin-Net Network Requirements for the EPIM-C Module Cable TypeNetwork Port Specifications AUI Cable Requirements for the EPIM-A and EPIM-X ModulesAUI Cable SEHI-32 and SEHI-34 Network Port Specifications SEHI-22 and SEHI-24 Network Port SpecificationsPin Champ Connector EPIM-T Installation REQUIREMENTS/SPECIFICATIONS Epim SpecificationsParameter Typical Worst Worst Case Typical Value Budget EPIM-F1 and EPIM-F2EPIM-F3 EPIM-F3Parameter Typical Minimum Maximum EPIM-C Connector TypeEPIM-A and EPIM-X EPIM-A and EPIM-X AUI PortTransceiver Requirements COMPreamble Delay Times Start of PacketsDelay Times JAM GeneralJAM Output Fault ProtectionPower Supply Requirements Output Min. Load Max. Load Max PowerPhysical SafetyUnpacking the Sehi Installing the SehiStacking the Sehi Stacking the Sehi Disconnect SEH and Sehi Interconnect Cables At the OUT Port Attaching the Strain Relief BracketRack Mounting the Sehi Installing the Sehi in the RackWall Mounting the Sehi Shelf or Table-top Installation Free-Standing InstallationInstallation Connecting the Sehi to the Power Source Connecting to Network Ports, SEHI-22 and SEHI-24 Connecting the Sehi to the NetworkEPIM-2 Connecting to Network Ports, SEHI-32 and SEHI-34 EPIM-T Cross-over Switch Connecting a UTP Segment to an EPIM-TConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C EPIM-A Connecting an AUI Cable to an EPIM-AConnecting an AUI Cable to an EPIM-X On Position Toward Back Epim OFF Position Toward Front Finishing the InstallationInstallation CHECK-OUT Chapter TroubleshootingUsing Lanview CPU PWRLNK Troubleshooting CLNUsing the Reset Button RCVChapter Local Management Local Management Management Terminal Requirements Management Terminal Connection Console Cable ConfigurationSetup Management Terminal Setup ParametersMenu Function Selection Display Setup General SetupSehi Local Management Local Management Accessing Local ManagementFeature Selection Screen Community Name Table Screen Local Management Using the Local Management ScreensCommunity Name AccessEditing the Community Name Field IP Address Configuration ScreenSubNet Mask Default GatewayPort Enable Override Setting the IP AddressSetting the Subnet Mask Using the Port Enable Override Setting the Default GatewayTrap Table Screen Exiting the Configuration ScreenTrap IP Address Configuring the Trap TableSnmp Community Name TrapsSnmp Tools Screen Exiting the Trap Table ScreenGet Next OID PrependGet SetCycles WalkRecall-OID StepGetting the Next OID Getting Individual OIDsViewing Multiple OIDs Setting an OIDWalking Through OIDs Stepping Through OIDsCycling Through OIDs Device Statistics Screen Exiting the Snmp Tools ScreenPort Admin. Status Errors ReceivedCRC Errors Alignment ErrorsPort Seg. Status Enable PortDisable Port Update-FreqSelecting the Appropriate Module/Port Using the Enable Port CommandExiting the Device Statistics Screen Using the Disable Port CommandTwisted Pair Wiring Tables Appendix a Twisted Pair Wiring TablesA-2 A-3 A-4 From Punch Down To RJ-45 Into Block Wallplate Office 10BASE-TDrop Device A-6 A-7 Champ Down Block If Required Ethernet Device SEHI-32/34 Punch Wall PlateFigure A-1. Punch Down Block A-9 French Power Supply CordGerman Spanish