Cabletron Systems SEHI-32 manual Connecting a UTP Segment to an EPIM-T, EPIM-T Cross-over Switch

Page 45

CONNECTING TO THE NETWORK

4.Check that the link LED on the 10BASE-T Ethernet device and the applicable LNK LED on the SEHI are on. If the LEDs are not on, perform each of the following steps until the LEDs are on:

a.Check that the 10BASE-T device and the SEHI have power.

b.Verify the cabling between the SEHI and the 10BASE-T device.

c.Check the cable for continuity.

If a link has not been established, contact Cabletron Systems Technical Support.

4.1.3Connecting a UTP Segment to an EPIM-T

Before connecting a segment to the EPIM-T, check each end of the segment to determine if the wires have been crossed-over for the proper connection. If the wires do not cross over, use the switch on the EPIM-T to internally cross over the RJ45 port. Refer to Figure 4-3 to properly set the EPIM-T cross-over switch.

Position X (crossed over)

1. RX+

5. NC

2. RX-

6. TX-

3. TX+

7. NC

4. NC

8. NC

Position =

(not crossed over)

1. TX+

5.

NC

2. TX-

6.

RX-

3. RX+

7. NC

4. NC

8. NC

Figure 4-3. EPIM-T Cross-over Switch

Page 4-4

Image 45
Contents 10BASE-T Intelligent Stackable HUB USER’S Guide Printed On Recycled Paper DOC Notice FCC NoticeCabletron Software Program License Cabletron SYSTEMS, INC Program License AgreementUnited States Government Restricted Rights Exclusion of Warranty Disclaimer of LiabilityTable of Contents Connecting to the Network InstallationTroubleshooting Local ManagementContents Appendix B Twisted Pair Wiring Tables A-1 Chapter Introduction Using this ManualSehi Overview Introduction Getting HelpRepeater Functionality Sehi FeaturesPolarity Detection and Correction Flash EEPROMsLanview LEDs Reset ButtonLocal Management Stackable CapabilitiesEpim Introduction Optional FeaturesDaughter Board Upgrade Kit Rack Mount or Wall Mount HardwareRelated Manuals HubSTACK Interconnect Cable Requirements Cable SpecificationsInsertion Loss LengthImpedance JitterTemperature DelayCrosstalk NoiseCable Type Attenuation Maximum Cable Length Fiber Optic Budget and Propagation DelayInstallation REQUIREMENTS/SPECIFICATIONS Thin-Net Network Requirements for the EPIM-C Module ConnectorsCable Type TerminatorsNetwork Port Specifications AUI Cable Requirements for the EPIM-A and EPIM-X ModulesAUI Cable SEHI-32 and SEHI-34 Network Port Specifications SEHI-22 and SEHI-24 Network Port SpecificationsPin Champ Connector EPIM-T Installation REQUIREMENTS/SPECIFICATIONS Epim SpecificationsParameter Typical Worst Worst Case Typical Value Budget EPIM-F1 and EPIM-F2EPIM-F3 EPIM-F3Parameter Typical Minimum Maximum EPIM-C Connector TypeEPIM-A and EPIM-X EPIM-A and EPIM-X AUI PortTransceiver Requirements COMDelay Times JAM Delay Times Start of PacketsGeneral PreamblePower Supply Requirements Fault ProtectionOutput Min. Load Max. Load Max Power JAM OutputPhysical SafetyUnpacking the Sehi Installing the SehiStacking the Sehi Stacking the Sehi Disconnect SEH and Sehi Interconnect Cables At the OUT Port Attaching the Strain Relief BracketRack Mounting the Sehi Installing the Sehi in the RackWall Mounting the Sehi Shelf or Table-top Installation Free-Standing InstallationInstallation Connecting the Sehi to the Power Source Connecting to Network Ports, SEHI-22 and SEHI-24 Connecting the Sehi to the NetworkEPIM-2 Connecting to Network Ports, SEHI-32 and SEHI-34 EPIM-T Cross-over Switch Connecting a UTP Segment to an EPIM-TConnecting to the Network Connecting to the Network Connecting to the Network Connecting a Thin-Net Segment to an EPIM-C EPIM-C EPIM-A Connecting an AUI Cable to an EPIM-AConnecting an AUI Cable to an EPIM-X On Position Toward Back Epim OFF Position Toward Front Finishing the InstallationInstallation CHECK-OUT Chapter TroubleshootingUsing Lanview CPU PWRUsing the Reset Button Troubleshooting CLNRCV LNKChapter Local Management Local Management Management Terminal Requirements Management Terminal Connection Console Cable ConfigurationMenu Function Selection Display Setup Management Terminal Setup ParametersGeneral Setup SetupSehi Local Management Local Management Accessing Local ManagementFeature Selection Screen Community Name Table Screen Local Management Using the Local Management ScreensCommunity Name AccessEditing the Community Name Field IP Address Configuration ScreenPort Enable Override Default GatewaySetting the IP Address SubNet MaskSetting the Subnet Mask Using the Port Enable Override Setting the Default GatewayTrap Table Screen Exiting the Configuration ScreenSnmp Community Name Configuring the Trap TableTraps Trap IP AddressSnmp Tools Screen Exiting the Trap Table ScreenGet OID PrependSet Get NextRecall-OID WalkStep CyclesGetting the Next OID Getting Individual OIDsViewing Multiple OIDs Setting an OIDWalking Through OIDs Stepping Through OIDsCycling Through OIDs Device Statistics Screen Exiting the Snmp Tools ScreenCRC Errors Errors ReceivedAlignment Errors Port Admin. StatusDisable Port Enable PortUpdate-Freq Port Seg. StatusSelecting the Appropriate Module/Port Using the Enable Port CommandExiting the Device Statistics Screen Using the Disable Port CommandTwisted Pair Wiring Tables Appendix a Twisted Pair Wiring TablesA-2 A-3 A-4 From Punch Down To RJ-45 Into Block Wallplate Office 10BASE-TDrop Device A-6 A-7 Champ Down Block If Required Ethernet Device SEHI-32/34 Punch Wall PlateFigure A-1. Punch Down Block A-9 German Power Supply CordSpanish French