Model 3196RC | 2 • Hardware installation |
|
|
Completing the hardware installation
This section verifies that the
Power is delivered from the CPCI chassis backplane through the
1.The POWER LED illuminates, indicating normal power is being applied to the 3196RC.
2.The green SYSTEM LED begins flashing, indicating the 3196RC is operating normally.
Hardware installation is now complete. To configure the 3196RC for operation, refer to chapter 3, “Configur- ing the
Completing the hardware installation | 34 |