3. OPERATING INSTRUCTIONS page 25
3.7.INITIAL INSTALLATION CHECKLIST
Plastic Detectors:
Background: __________ Counts
Test Source:  | 
  | 
  | 
  | 
Isotope: __________  | Activity;  | __________nCi  | |
Serial No.: __________  | Date of latest assay: __________  | ||
No. of Counts:  | 
  | 
  | 
  | 
Right: __________  | Top: __________  | Left: __________  | |
Bottom: _________  | Back: __________  | Door: __________  | |
Total: __________  | 
  | 
  | 
  | 
Efficiency:  | 
  | 
  | 
  | 
Right: __________  | Top: __________  | Left: __________  | |
Bottom: _________  | Back: __________  | Door: __________  | |
Total: __________  | 
  | 
  | 
  | 
Discriminator Settings:  | 
  | 
  | 
  | 
LLD: ___________  | ULD: __________  | 
  | |
Model