3. OPERATING INSTRUCTIONS page 25
3.7.INITIAL INSTALLATION CHECKLIST
Plastic Detectors:
Background: __________ Counts
Test Source: |
|
|
|
Isotope: __________ | Activity; | __________nCi | |
Serial No.: __________ | Date of latest assay: __________ | ||
No. of Counts: |
|
|
|
Right: __________ | Top: __________ | Left: __________ | |
Bottom: _________ | Back: __________ | Door: __________ | |
Total: __________ |
|
|
|
Efficiency: |
|
|
|
Right: __________ | Top: __________ | Left: __________ | |
Bottom: _________ | Back: __________ | Door: __________ | |
Total: __________ |
|
|
|
Discriminator Settings: |
|
|
|
LLD: ___________ | ULD: __________ |
|
Model