Sigma BM-286A service manual Maintenance

Page 41

5. MAINTENANCE page 38

5.5.CALIBRATION CHECK-LIST High Voltage:

HHV #1: __________ VDC HHV #2: __________ VDC HHV #3: __________ VDC

HHV #4: __________ VDC HHV #5: __________ VDC HHV #6: __________ VDC

New Voltage Setting (if adjusted): ____________________

HHV #1: __________ VDC HHV #2: __________ VDC HHV #3: __________ VDC

HHV #4: __________ VDC HHV #5: __________ VDC HHV #6: __________ VDC

Pulse Amplitude - Plastic Detectors:

 

 

 

Test Source:

 

 

 

Isotope:__________

Activity: __________ µCi

 

Serial No.:________

Date of latest assay:__________

Peak Volts:

 

 

 

Right: __________

Top: __________

Left: __________

Bottom: _________

Back: __________

Door: __________

New Readings (if adjusted):

 

 

 

Right: __________

Top: __________

Left: __________

Bottom: _________

Back: __________

Door: __________

Variance (final readings only):

 

 

 

Number of trials: __________

Variance time: __________

Right: __________

Top: __________

Left: __________

Bottom: _________

Back: __________

Door: __________

Performed by: _____________________________Date: ___________________

Model BM-286A

Image 41
Contents Waste Monitor Model BM-286A Inspection and Installation Table of ContentsMaintenance Theory of OperationAppendix Warranty Glossary Formulas TroubleshootingConfiguration Tracking Sheet Parts Recommended Spare Parts Spare Parts Ordering InformationScope and Purpose of Manual IntroductionSpecifications Introduction Introduction Inspection Installation General Overview Operating InstructionsPOWER-UP and SELF-TESTS Level One Access Access MenuPCA-II Normal Operation Operating Instructions Programming the System Abcdefgh SET-UP MenuOperating Instructions Operating Instructions Waste Stream Parameters Operating Instructions Operating Instructions Operating Instructions This value is used only when the Alarm Type is set to DPM Utilities Menu Operating Instructions Reports Initial Installation Checklist Operating Instructions BM-286A Waste Stream SET-UP Worksheet Unit Operation Theory of Operation Theory of Operation Theory of Operation Theory of Operation Operator Maintenance Maintenance Maintenance ULD Settings for Plastic DetectorsLLD Weight Calibration Maintenance Diagnostic Aids Fault Isolation Computers Longs Peak Court LONGMONT, Colorado Appendix B. Glossary Appendix B. Glossary Activity from Counts Reliable Detectable Activity RDA Formula Variance System Modifications Configuration Tracking SheetLongs Peak Court LONGMONT,COLORADO Drawings