Allied Telesis AT-9000/12POE, AT-9000/28POE manual Fiber Optic Transceivers

Page 78

AT-9000 Gigabit Ethernet Switch Installation Guide

Fiber Optic Transceivers

This section applies only to the AT-9000/12POE, AT-9000/28, AT-9000/ 28POE, and AT-9000/28SP switches.

The SFP LINK/ACT LEDs on the SFP ports are solid or flashing green when the fiber optic transceivers have links to end nodes. If a transceiver is cabled to an end node, but the LINK/ACT LED is off, try the following:

If all of the SFP LINK/ACT LEDs on the switch are off, try pressing the ecoFriendly button on the switch front panel to turn on the LEDs.

Check that the fiber optic transceiver is firmly inserted into the slot.

Check that both ends of the fiber optic cable are securely connected to the ports on the transceiver and end node.

Verify that the end node is powered on and operating properly.

Review the operating specifications of the fiber optic transceiver and end node to verify that the devices have the same speed and duplex mode.

Check that the operating specifications, including wavelength and maximum operating distance, of the transceiver are compatible with the fiber optic port on the end node.

Make sure that you are using the appropriate type of fiber optic cable and that the cable length does not exceed the allowed maximum distance. The cable specifications for the transceivers are provided in the installation instructions that ship with the modules.

Use a fiber optic tester to test the whether the optical signal is too weak (that is, sensitivity) or too strong (that is, maximum input power). The operating specifications of the fiber optic transceivers are shipped with the units.

Try replacing the fiber optic cable.

Check the two strands of the fiber optic cable to be sure that the receive fiber connector is connected to the transmit connector on the remote end node, and that the transmit fiber connector is connected to the receive connector on the end node.

78

Image 78
Contents Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Snmp Figures Figures Tables Tables Preface Document Conventions Contacting Allied Telesis AT-9000 Gigabit Ethernet Switch Installation Guide Overview ChapterSwitch Models and Features AT-9000 Series ModelsPower over Ethernet RS-232 Console PortManagement Methods AT-9000 Series Gigabit Ethernet Switches AT-9000/12POE SwitchAT-9000/12POE Switch Front and Rear Panels AT-9000/28 Switch SFP/RJ45AT-9000/28POE Switch AT-9000/28POE Switch Front and Rear PanelsAT-9000/28SP Switch AT-9000/28SP Switch Front and Rear PanelsAT-9000/52 Switch AT-9000/52 Switch Front and Rear Panels10/100/1000Base-T Twisted-Pair Ports Wiring Configuration Maximum Distance 10Mbps 100Mbps 1000Mbps Cable Type Non PoE PoE+ Power Over Ethernet Powered Device Classes Port Prioritization Wiring Implementation SFP Slots 10/100/1000 SFP Slot Base-T PortOverview Combo Ports Overview Console Port Mode LED Select Button LEDsLink LED Mode SFP LINK/ACT LEDs EcoFriendly Button Front Panel ecoFriendly ButtonPower Supplies Power Connectors AT-9000 Gigabit Ethernet Switch Installation Guide Beginning the Installation Installation Procedures Reviewing Safety Precautions AT-9000 Gigabit Ethernet Switch Installation Guide Beginning the Installation AT-9000 Gigabit Ethernet Switch Installation Guide Selecting a Site Unpacking the Switch Installing the Switch on a Table or Rack Installing the Switch on a Table or Desktop Installing the Switch in a Rack Attaching Brackets for Rack Mounting Mounting the Switch in a Rack AT-9000 Gigabit Ethernet Switch Installation Guide Cabling the Networking Ports AT-9000 Gigabit Ethernet Switch Installation Guide Powering On the Switch Applying AC Power Connecting the AC Power CordPowering On the Switch Starting a Local Management Session Powering On the Switch Management Methods Local Management Telnet ManagementSecure Shell Management Web Browser Management AT-9000 Gigabit Ethernet Switch Installation Guide Adding a Management IP Address Awplus enable Troubleshooting Power LED Is Off Twisted-Pair Port Link LED Is Off AT-9000 Gigabit Ethernet Switch Installation Guide Cannot Establish a Local Out-of-Band Management Session All Port LEDs Are Off Power Over Ethernet Fiber Optic Transceivers Slow Performance Between Switch and Host Device AT-9000 Gigabit Ethernet Switch Installation Guide Technical Specifications Physical SpecificationsAppendix a Environmental Specifications Power SpecificationsSafety and Electromagnetic Emissions Certifications Quality and ReliabilityCompliance Standards 10/100/1000Base-T Twisted-Pair Port Connectors Pin SignalPin Pair Signal Console Port PinoutsAT-9000 Gigabit Ethernet Switch Installation Guide