Symantec ATCA-2210 manual Obey ESD precautions, Prepare for installation

Page 1

PROMENTUM™

SWITCH AND CONTROL MODULE

INSTALLATION GUIDE

ATCA-2210

This document describes how to install and to set up the Promentum™ ATCA-2210 switch and control module (SCM).

Obey ESD precautions

WARNING! Obey the electrostatic discharge (ESD) procedures described at www.radisys.com when you install the product.

Electrostatic discharge can cause permanent damage to static-sensitive components in this product. Important ESD procedures include:

ƒKeep the product in its ESD shielding bag until a step tells you to remove it.

ƒPut on a grounded wrist strap before you move near or touch the product.

ƒInstall the product only in a grounded work area.

Prepare for installation

The installation of the SCM requires the following:

ƒAn AdvancedTCA® (ATCA®) shelf, such as a RadiSys ATCA-6000, ATCA-6006, ATCA-6014, or ATCA-6016 shelf

ƒA 9-pin D-shell to RJ-45 serial port cable (shipped with the SCM)

ƒA standard crossover Ethernet cable

ƒAdequate ventilation for the shelf

Install SFPs or XFPs on the SCM

The SCM comes with sockets for small form-factor pluggable (SFP) and 10 Gigabit small form-factor pluggable (XFP) transceiver modules. If SFPs and XFPs are installed, they can provide external connections to the Ethernet interfaces. The sockets are accessed from the faceplate of the SCM.

007-02524-0004 • September 2008

Copyright © 2006-2008 by RadiSys Corporation. All rights reserved.

RadiSys is a registered trademark and Promentum is a trademark of RadiSys Corporation. Linux is a registered trademark of Linus Torvalds. AdvancedTCA and ATCA are registered trademarks of PCI Industrial Computer Manufacturers Group. Procomm Plus and Symantec are registered trademarks of Symantec Corporation. All other trademarks, registered trademarks, service marks, and trade names are the property of their respective owners.

Image 1
Contents Prepare for installation Obey ESD precautionsInstall SFPs or XFPs on the SCM Transceiver installation Configuration recommendationsXFP filler plug installation Filler plug installationShelf After installation of the SCM SCM installation checklistSCM’s on-board Shelf Manager RadiSys shelfATCA-6006, 5U, 6-slot Install the SCM in the shelfPush inner latch in all the way Pull out Connect to the SCM Connect to the Ethernet maintenance portConnect to the serial port Showing ATCA-2210#View port status Verify switch operationBase-ethernet Fabric-ethernetEnable specific ports Enable all portsATCA-2210-Base# ATCA-2210-Fabric# Base Ethernet switch internal ports Where s and p have the following valuesInterface s/p ATCA-2210# promptVerify shelf management operation Disable the Shelf Manager on the SCMATCA-2210# Root@ATCA-2210@ Debugmode ~#Rsysdebug Rsysdebug -hRsysdebug -i SER on the SCM Enable the Shelf Manager on the SCMAs a laptop Resysdebug -hWhere to go from here COM Express module setupSCM ShMgr Mode Enabled Rear I/O connectivityWhere to get more product information