Symantec ATCA-2210 manual Install the SCM in the shelf, ATCA-6006, 5U, 6-slot

Page 5

Install the SCM in the shelf

Install the SCM in the shelf

1.Follow ESD precautions and make sure you are adequately grounded before handling the transceivers and the SCM.

2.Remove the SCM from its antistatic bag.

3.Open both ejector latches outward.

WARNING! Never force open an ejector latch. Press the inner latch all the way in before you pull out the handle. If the latch does not open fully, close the latch and try again, making sure the inner latch is fully depressed.

4.Slide the SCM into one of the hub slots on the shelf. The table below show the hub slots for RadiSys shelves. If installing the SCM in a non-RadiSys shelf, refer to the documentation for that shelf.

RadiSys shelf

Hub slots

ATCA-6000, 12U 14-slot

7

8

 

 

 

ATCA-6006, 5U, 6-slot

1

2

 

 

 

ATCA-6014, 13U 14-slot

7

8

 

 

 

ATCA-6016, 13U 16-slot

8

9

 

 

 

Open position

a)push inner latch in all the way

b) pull out

Closed position

Note: These are the physical slot numbers.

push in

If correctly aligned, the edges of the SCM fit within the narrow guide rails of the shelf.

WARNING! Do not force the SCM into the slot:

ƒ To avoid damage to connectors, make sure the rear slot is either empty or contains a module compatible with the SCM.

ƒ If the SCM does not slide easily, make sure you are inserting the SCM into the correct slot and that it is aligned properly.

5.Once the SCM is inserted all the way into the shelf, simultaneously close both ejector latches inward. This seats the SCM’s connectors into the shelf’s backplane.

The hot-swap (H/S) LED light flashes until the SCM is fully powered. Once powered, the LED light turns off.

If the LED remains solid blue or keeps flashing after the SCM is inserted, it indicates the installation has failed. Please see the ATCA-2210 Switch and Control Module Reference for more information.

6.Secure the SCM in its slot by hand tightening the two fastening screws on each end of the module’s front panel.

7.Repeat these steps if you are installing a second SCM in the remaining hub slot. Installing two SCMs on the shelf allows for redundancy—a means of providing continuous system functionality even if a failure occurs on one of the SCMs.

5

Image 5
Contents Install SFPs or XFPs on the SCM Obey ESD precautionsPrepare for installation Transceiver installation Configuration recommendationsXFP filler plug installation Filler plug installationShelf After installation of the SCM SCM installation checklistSCM’s on-board Shelf Manager RadiSys shelfPush inner latch in all the way Pull out Install the SCM in the shelfATCA-6006, 5U, 6-slot Connect to the SCM Connect to the Ethernet maintenance portConnect to the serial port Showing ATCA-2210#View port status Verify switch operationBase-ethernet Fabric-ethernetATCA-2210-Base# ATCA-2210-Fabric# Enable all portsEnable specific ports Base Ethernet switch internal ports Where s and p have the following valuesInterface s/p ATCA-2210# promptVerify shelf management operation Disable the Shelf Manager on the SCMATCA-2210# Root@ATCA-2210@ Debugmode ~#Rsysdebug -i Rsysdebug -hRsysdebug SER on the SCM Enable the Shelf Manager on the SCMAs a laptop Resysdebug -hWhere to go from here COM Express module setupSCM ShMgr Mode Enabled Rear I/O connectivityWhere to get more product information