Symantec ATCA-2210 SCM installation checklist, Shelf After installation of the SCM, RadiSys shelf

Page 4

Installation Guide

SCM installation checklist

The following table describes the possible installation scenarios for the SCM, the appropriate tasks to complete for the scenarios, and the order to complete the tasks:

SCM is being

Configuration

Tasks to complete and order to complete them

 

Installed in a RadiSys shelf

Standard configuration.

1.

Install the SCM in the shelf on page 5

____

 

 

2.

Connect to the SCM on page 6

____

 

 

3.

Verify switch operation on page 7

____

 

 

4.

Verify shelf management operation on page 10

____

 

 

 

 

 

Installed in a non-RadiSys

Post-installation configuration required:

1.

Install the SCM in the shelf on page 5

____

shelf

After installation of the SCM in the

2.

Disable the Shelf Manager on the SCM on page 10

____

 

non-RadiSys shelf, you must disable the

 

3.

Verify switch operation on page 7

____

 

SCM’s on-board Shelf Manager.

 

 

 

 

 

 

 

 

 

Removed from a non-RadiSys

Pre-removal configuration required:

1.

Enable the Shelf Manager on the SCM on page 12

____

shelf and reinstalled in a

Before you remove the SCM from the

2.

Remove the SCM from the non-RadiSys shelf. For

 

RadiSys shelf

non-RadiSys shelf, you must enable the

 

 

SCM removal instructions, see the ATCA-2210 Switch

 

 

SCM’s on-board Shelf Manager.

 

 

 

 

and Control Reference.

____

 

 

 

 

 

3.

Install the SCM in the shelf on page 5

____

 

 

4.

Connect to the SCM on page 6

____

 

 

5.

Verify switch operation on page 7

____

 

 

6.

Verify shelf management operation on page 10

____

 

 

 

 

 

4

Image 4
Contents Prepare for installation Obey ESD precautionsInstall SFPs or XFPs on the SCM Configuration recommendations Transceiver installationFiller plug installation XFP filler plug installationSCM installation checklist Shelf After installation of the SCMSCM’s on-board Shelf Manager RadiSys shelfATCA-6006, 5U, 6-slot Install the SCM in the shelfPush inner latch in all the way Pull out Connect to the Ethernet maintenance port Connect to the SCMConnect to the serial port Showing ATCA-2210#Verify switch operation View port statusBase-ethernet Fabric-ethernetEnable specific ports Enable all portsATCA-2210-Base# ATCA-2210-Fabric# Where s and p have the following values Base Ethernet switch internal portsInterface s/p ATCA-2210# promptDisable the Shelf Manager on the SCM Verify shelf management operationATCA-2210# Root@ATCA-2210@ Debugmode ~#Rsysdebug Rsysdebug -hRsysdebug -i Enable the Shelf Manager on the SCM SER on the SCMAs a laptop Resysdebug -hCOM Express module setup Where to go from hereSCM ShMgr Mode Enabled Rear I/O connectivityWhere to get more product information