Enterasys Networks 2H252-25R manual Troubleshooting

Page 10

3

4

A

INSTALLATION

3.1

Unpacking the Device

3-1

3.2

Installing Options

3-2

3.3

Installing the Device

3-3

 

3.3.1

Tabletop or Shelf Installation

3-3

 

3.3.2

Rackmount Installation

3-4

 

3.3.3

Connecting Power

3-8

3.4

Connecting to the Network

3-9

 

3.4.1

Connecting Twisted Pair Cables to Fixed Ports

3-9

3.5

Completing the Installation

3-12

TROUBLESHOOTING

4.1

Using LANVIEW

4-1

4.2

Troubleshooting Checklist

4-6

4.3

Using the RESET Button

4-9

SPECIFICATIONS

A.1

Device Specifications

A-1

A.2

Physical Properties

A-1

A.3

Electrical Specifications

A-2

A.4

Environmental Requirements

A-2

A.5

Input/Output Ports

A-2

A.6

COM Port Pinout Assignments

A-3

A.7

Regulatory Compliance

A-3

B

OPTIONAL INSTALLATIONS AND

 

 

MODE SWITCH BANK SETTINGS

 

 

B.1

Required Tools

B-1

 

B.2

Removing the Chassis Cover

B-2

 

B.3

Setting the Mode Switches

B-5

 

B.4

SIMM Upgrade

B-7

 

 

B.4.1 Locating SIMMs

B-7

 

 

B.4.2 Installing the DRAM SIMM

B-8

 

B.5

Installing Optional HSIM or VHSIM Interface Modules

B-9

INDEX

viiiContents

Image 10
Contents 2H252-25R SmartSwitch Installation User’s Guide Page Page Vcci Notice FCC NoticeIndustry Canada Notice Class a ITE NoticeEnterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Troubleshooting Figures Tables About This Guide Using this GuideStructure of this Guide Related Documents Document Conventions Guide uses the following conventionsPage Introduction OverviewConnectivity Runtime IP Address DiscoveryFull Duplex Switched Ethernet SmartTrunkPort/VLAN Redirect Functions Remote Monitoring RmonBroadcast Suppression Rate LimitingGarp Switch Operation Flow ControlManagement Switching Options11 802.1 Port Priority Optional HSIMs and VHSIMsStandards Compatibility Lanview Diagnostic LEDsYear 2000 Compliant Getting Help Your email addressNetwork Requirements 10BASE-T Network100BASE-TX Network Installation Unpacking the DeviceInstalling Options Guidelines for Tabletop and Shelf Installations Installing the DeviceTabletop or Shelf Installation InstallationRackmount Installation Guidelines for the Rackmount InstallationAttaching the Strain-Relief Bracket Rack Mounting the 2H252-25R Strain-Relief Bracket ScrewsRackmount Bracket Screws Connecting Power Redundant Primary AC outlets are On separate circuitsConnecting to the Network Connecting Twisted Pair Cables to Fixed PortsConnecting the Twisted Pair Segment Straight-Through Cable Completing the Installation Troubleshooting Using LanviewLanview LEDs PWR CPU FDX Troubleshooting Checklist Local Management User’s Guide2E253, 2H252, 2H253 SmartSwitch Series 2E253 Using the Reset Button Reset ButtonPage Device Specifications SpecificationsPhysical Properties Environmental Requirements Electrical SpecificationsINPUT/OUTPUT Ports COM Port Pinout Assignments Regulatory CompliancePage Optional Installations Mode Switch Bank Settings Required ToolsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Screws Chassis Cover Front Panel Setting the Mode Switches Figure B-2 Mode Switch Location6Optional Installations and Mode Switch Bank Settings Simm Upgrade Locating SIMMsInstalling the Dram Simm Installing Optional Hsim or Vhsim Interface Modules Figure B-5 Hsim and Vhsim Connector LocationsPage Index NumericsIndex-2