Enterasys Networks 2H252-25R manual Setting the Mode Switches, Figure B-2 Mode Switch Location

Page 57

Setting the Mode Switches

B.3 SETTING THE MODE SWITCHES

Figure B-2shows the location of the mode switches and the switch settings for normal operation. These switches are set at the factory and rarely need to be changed.

Switch definitions and positions are as follows:

Switches 1 through 4 – For Enterasys Networks use only.

Switch 5 – COM Port Autobaud. The default (OFF) position enables Autobaud sensing on the COM port for Local Management sessions. Changing the switch to the ON position disables Autobaud sensing and sets the COM port to 9600 baud for Local Management sessions.

Figure B-2 Mode Switch Location

TOP VIEW WITHOUT COVER

Primary

Power

Supply

Redundant

Power

Supply

MODE SWITCH BANK

ON

OFF

1 2 3 4 5 6 7 8

FRONT PANEL

25041-11

Optional Installations and Mode Switch Bank Settings B-5

Image 57
Contents 2H252-25R SmartSwitch Installation User’s Guide Page Page Industry Canada Notice FCC NoticeVcci Notice Class a ITE NoticeEnterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Troubleshooting Figures Tables Using this Guide About This GuideStructure of this Guide Related Documents Guide uses the following conventions Document ConventionsPage Overview IntroductionRuntime IP Address Discovery ConnectivitySmartTrunk Full Duplex Switched EthernetBroadcast Suppression Remote Monitoring RmonPort/VLAN Redirect Functions Rate LimitingFlow Control Garp Switch Operation11 802.1 Port Priority Switching OptionsManagement Optional HSIMs and VHSIMsLanview Diagnostic LEDs Standards CompatibilityYear 2000 Compliant Your email address Getting Help10BASE-T Network Network Requirements100BASE-TX Network Unpacking the Device InstallationInstalling Options Tabletop or Shelf Installation Installing the DeviceGuidelines for Tabletop and Shelf Installations InstallationGuidelines for the Rackmount Installation Rackmount InstallationAttaching the Strain-Relief Bracket Strain-Relief Bracket Screws Rack Mounting the 2H252-25RRackmount Bracket Screws Redundant Primary AC outlets are On separate circuits Connecting PowerConnecting Twisted Pair Cables to Fixed Ports Connecting to the NetworkConnecting the Twisted Pair Segment Straight-Through Cable Completing the Installation Using Lanview TroubleshootingLanview LEDs PWR CPU FDX Local Management User’s Guide Troubleshooting Checklist2E253, 2H252, 2H253 SmartSwitch Series 2E253 Reset Button Using the Reset ButtonPage Specifications Device SpecificationsPhysical Properties Electrical Specifications Environmental RequirementsINPUT/OUTPUT Ports Regulatory Compliance COM Port Pinout AssignmentsPage Required Tools Optional Installations Mode Switch Bank SettingsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Screws Chassis Cover Front Panel Figure B-2 Mode Switch Location Setting the Mode Switches6Optional Installations and Mode Switch Bank Settings Locating SIMMs Simm UpgradeInstalling the Dram Simm Figure B-5 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesPage Numerics IndexIndex-2