Enterasys Networks 2H252-25R Optional Installations Mode Switch Bank Settings, Required Tools

Page 53

B

Optional Installations and

Mode Switch Bank Settings

ELECTRICAL HAZARD: ONLY QUALIFIED SERVICE PERSONNEL SHOULD ATTEMPT THE FOLLOWING PROCEDURES.

NUR QUALIFIEZIERTE SERVICE PERSONNAL DIE FOLGENDE PROCEDURE FOLGEN SOLLTEN.

SOLAMENTE PERSONAL CALIFICADO DEBE INTENTAR ESTE PROCEDIMIENTO.

The top cover must be removed to gain access to the mode bank switches, to install optional FLASH or DRAM Single In-line Memory Modules (SIMMs), or to install an optional High Speed Interface Module (HSIM) or Very High Speed Interface Module (VHSIM).

This appendix covers the following items:

Required tools (Section B.1)

Removing the chassis cover (Section B.2)

Locations, functions, and settings for the mode switches (Section B.3)

Installing optional SIMM upgrades (Section B.4)

Location of Optional HSIMs (Section B.5)

B.1 REQUIRED TOOLS

Use the following tools to perform the procedures provided in this appendix:

Antistatic wrist strap

Phillips screwdriver

Optional Installations and Mode Switch Bank Settings B-1

Image 53
Contents 2H252-25R SmartSwitch Installation User’s Guide Page Page Industry Canada Notice FCC NoticeVcci Notice Class a ITE NoticeEnterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Troubleshooting Figures Tables Structure of this Guide Using this GuideAbout This Guide Related Documents Guide uses the following conventions Document ConventionsPage Overview IntroductionRuntime IP Address Discovery ConnectivitySmartTrunk Full Duplex Switched EthernetBroadcast Suppression Remote Monitoring RmonPort/VLAN Redirect Functions Rate LimitingFlow Control Garp Switch Operation11 802.1 Port Priority Switching OptionsManagement Optional HSIMs and VHSIMsYear 2000 Compliant Lanview Diagnostic LEDsStandards Compatibility Your email address Getting Help10BASE-T Network Network Requirements100BASE-TX Network Unpacking the Device InstallationInstalling Options Tabletop or Shelf Installation Installing the DeviceGuidelines for Tabletop and Shelf Installations InstallationGuidelines for the Rackmount Installation Rackmount InstallationAttaching the Strain-Relief Bracket Strain-Relief Bracket Screws Rack Mounting the 2H252-25RRackmount Bracket Screws Redundant Primary AC outlets are On separate circuits Connecting PowerConnecting Twisted Pair Cables to Fixed Ports Connecting to the NetworkConnecting the Twisted Pair Segment Straight-Through Cable Completing the Installation Using Lanview TroubleshootingLanview LEDs PWR CPU FDX Local Management User’s Guide Troubleshooting Checklist2E253, 2H252, 2H253 SmartSwitch Series 2E253 Reset Button Using the Reset ButtonPage Physical Properties SpecificationsDevice Specifications INPUT/OUTPUT Ports Electrical SpecificationsEnvironmental Requirements Regulatory Compliance COM Port Pinout AssignmentsPage Required Tools Optional Installations Mode Switch Bank SettingsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Screws Chassis Cover Front Panel Figure B-2 Mode Switch Location Setting the Mode Switches6Optional Installations and Mode Switch Bank Settings Locating SIMMs Simm UpgradeInstalling the Dram Simm Figure B-5 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesPage Numerics IndexIndex-2