Enterasys Networks
2H252-25R
manual
Troubleshooting
Specifications
Install
Connecting Power
Using the Reset Button
Lanview Diagnostic LEDs
Setting the Mode Switches
Simm Upgrade
Full Duplex Switched Ethernet
Using this Guide
Page 62
Page 61
Page 63
Image 62
Page 61
Page 63
Contents
2H252-25R SmartSwitch Installation User’s Guide
Page
Page
Vcci Notice
FCC Notice
Industry Canada Notice
Class a ITE Notice
Enterasys NETWORKS, INC Program License Agreement
Page
Declaration of Conformity
Page
Contents
Troubleshooting
Figures
Tables
Structure of this Guide
Using this Guide
About This Guide
Related Documents
Document Conventions
Guide uses the following conventions
Page
Introduction
Overview
Connectivity
Runtime IP Address Discovery
Full Duplex Switched Ethernet
SmartTrunk
Port/VLAN Redirect Functions
Remote Monitoring Rmon
Broadcast Suppression
Rate Limiting
Garp Switch Operation
Flow Control
Management
Switching Options
11 802.1 Port Priority
Optional HSIMs and VHSIMs
Year 2000 Compliant
Lanview Diagnostic LEDs
Standards Compatibility
Getting Help
Your email address
Network Requirements
10BASE-T Network
100BASE-TX Network
Installation
Unpacking the Device
Installing Options
Guidelines for Tabletop and Shelf Installations
Installing the Device
Tabletop or Shelf Installation
Installation
Rackmount Installation
Guidelines for the Rackmount Installation
Attaching the Strain-Relief Bracket
Rack Mounting the 2H252-25R
Strain-Relief Bracket Screws
Rackmount Bracket Screws
Connecting Power
Redundant Primary AC outlets are On separate circuits
Connecting to the Network
Connecting Twisted Pair Cables to Fixed Ports
Connecting the Twisted Pair Segment
Straight-Through Cable
Completing the Installation
Troubleshooting
Using Lanview
Lanview LEDs
PWR
CPU
FDX
Troubleshooting Checklist
Local Management User’s Guide
2E253, 2H252, 2H253
SmartSwitch Series 2E253
Using the Reset Button
Reset Button
Page
Physical Properties
Specifications
Device Specifications
INPUT/OUTPUT Ports
Electrical Specifications
Environmental Requirements
COM Port Pinout Assignments
Regulatory Compliance
Page
Optional Installations Mode Switch Bank Settings
Required Tools
Removing the Chassis Cover
Optional Installations and Mode Switch Bank Settings B-3
Screws Chassis Cover Front Panel
Setting the Mode Switches
Figure B-2 Mode Switch Location
6Optional Installations and Mode Switch Bank Settings
Simm Upgrade
Locating SIMMs
Installing the Dram Simm
Installing Optional Hsim or Vhsim Interface Modules
Figure B-5 Hsim and Vhsim Connector Locations
Page
Index
Numerics
Index-2
Related pages
Troubleshooting Tips Support for GE 165D4700P381
Technical specifications of ADAM-5050 for Advantech RS-485
Error Message List for Brother P-touch 1750
Autotuning Procedure Diagram for Athena Technologies 16C
How to Apply These Terms to Your New Programs for Samsung SNC-B5368P
Reinstalling Software for Dell KR954
Parts List for PM1300TX Dust Collector Base Machine for Powermatic PM1300TX
Language code list for Toshiba SD-37VBSB
Accessing the Backup Configuration for Pelco dx8100
Power Freeze Congélation rapide for Samsung RL55VEBTS1/XEF
How can I adjust the print contrast on my Rhino 5200?
See instructions
Top
Page
Image
Contents