Enterasys Networks 2H252-25R manual Installing the Device, Tabletop or Shelf Installation

Page 29

Installing the Device

3.3INSTALLING THE DEVICE

The 2H252-25R may be installed on a tabletop, shelf, or in a 19-inch rack. Section 3.3.1 describes a tabletop or shelf installation and Section 3.3.2 describes the rackmount installation.

ELECTRICAL HAZARD: To prevent possible personal injury and/or damage to the unit, do NOT connect power to the 2H252-25R until instructed to do so.

3.3.1Tabletop or Shelf Installation

The following two subsections provide guidelines for installation on a tabletop or shelf.

Guidelines for Tabletop and Shelf Installations

Tabletop and shelf installations must be within reach of the network cabling and meet the requirements listed below:

Locate the 2H252-25R within seven feet of an appropriately grounded power receptacle that meets the power supply requirements listed in Appendix A.

In a shelf installation, the shelf must support 13.5 kg (30 lb) of static weight for each 2H252-25R.

Maintain a temperature of between 5°C (41°F) and 40°C (104°F) at the installation site with fluctuations of less than 10°C (18°F) per hour.

Maintain a 2-inch clearance from the left, right, and rear sides of the device to provide adequate ventilation.

Installation

For a tabletop or shelf installation, locate the 2H252-25R within seven feet of its power source and on an unrestricted free surface area as shown in Figure 3-1. Proceed to Section 3.3.3 for power connection instructions.

CAUTION: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in) at the left, right, and rear of the 2H252-25R.

Installation 3-3

Image 29
Contents 2H252-25R SmartSwitch Installation User’s Guide Page Page Industry Canada Notice FCC NoticeVcci Notice Class a ITE NoticeEnterasys NETWORKS, INC Program License Agreement Page Declaration of Conformity Page Contents Troubleshooting Figures Tables Structure of this Guide Using this GuideAbout This Guide Related Documents Guide uses the following conventions Document ConventionsPage Overview IntroductionRuntime IP Address Discovery ConnectivitySmartTrunk Full Duplex Switched EthernetBroadcast Suppression Remote Monitoring RmonPort/VLAN Redirect Functions Rate LimitingFlow Control Garp Switch Operation11 802.1 Port Priority Switching OptionsManagement Optional HSIMs and VHSIMsYear 2000 Compliant Lanview Diagnostic LEDsStandards Compatibility Your email address Getting Help10BASE-T Network Network Requirements 100BASE-TX Network Unpacking the Device InstallationInstalling Options Tabletop or Shelf Installation Installing the DeviceGuidelines for Tabletop and Shelf Installations InstallationGuidelines for the Rackmount Installation Rackmount InstallationAttaching the Strain-Relief Bracket Strain-Relief Bracket Screws Rack Mounting the 2H252-25RRackmount Bracket Screws Redundant Primary AC outlets are On separate circuits Connecting PowerConnecting Twisted Pair Cables to Fixed Ports Connecting to the NetworkConnecting the Twisted Pair Segment Straight-Through Cable Completing the Installation Using Lanview TroubleshootingLanview LEDs PWR CPU FDX Local Management User’s Guide Troubleshooting Checklist2E253, 2H252, 2H253 SmartSwitch Series 2E253 Reset Button Using the Reset ButtonPage Physical Properties SpecificationsDevice Specifications INPUT/OUTPUT Ports Electrical SpecificationsEnvironmental Requirements Regulatory Compliance COM Port Pinout AssignmentsPage Required Tools Optional Installations Mode Switch Bank SettingsRemoving the Chassis Cover Optional Installations and Mode Switch Bank Settings B-3 Screws Chassis Cover Front Panel Figure B-2 Mode Switch Location Setting the Mode Switches6Optional Installations and Mode Switch Bank Settings Locating SIMMs Simm UpgradeInstalling the Dram Simm Figure B-5 Hsim and Vhsim Connector Locations Installing Optional Hsim or Vhsim Interface ModulesPage Numerics IndexIndex-2