Dell 7000 Series manual Contents

Page 3

Stacking Dell PowerConnect 7000 Series Switches

 

Contents

 

Introduction

2

Applicability

2

Stacking and Management

2

Stacking and Performance

3

Stacking and Redundancy

3

Mixing M6348 and PC7000 Series Switches in a Stack

5

Power-Up Sequencing Considerations

5

Initial Installation and Power-up of a Stack

7

Selecting the Master Unit

8

Selecting the Standby Unit

8

Updating the Firmware on a Stack

9

Automatic Update

9

Manual Update

10

Creating a Separate VLAN for File Downloads

11

Adding a Stack Member with Minimal Interruption

16

Removing a Stack Member with Minimal Interruption

17

Merging Two Operational Stacks

18

Synchronizing the Running Configuration between the Master and Standby Units

18

Master Failover

18

Effect of Master Failover on PoE Devices

18

Stack Member Failover

19

Failover Scenarios

19

Scenario 1

19

Scenario 2

20

Scenario 3

21

Nonstop Forwarding

22

Initiating a Warm Failover of the Manager Unit

23

Nonstop Forwarding Scenario

23

NSF Scenario Configuration via CLI

25

NSF Example 1

29

NSF Example 2:

29

NSF Re-convergence Timing

30

Medium Configuration

30

Small Configuration

31

Stacking CLI Commands

31

Stacking Web Interface

32

Summary

32

Page 1

Image 3
Contents Dell Technical White Paper Stacking Dell PowerConnect Series SwitchesStacking Dell PowerConnect 7000 Series Switches Contents Introduction ApplicabilityStacking and Management Stacking and Redundancy Stacking and PerformanceDual Stacking Modules Configured in a Ring Power-Up Sequencing Considerations Mixing M6348 and PC7000 Series Switches in a StackConsole#boot auto-copy-sw allow-downgrade Initial Installation and Power-up of a Stack Selecting the Standby Unit Selecting the Master UnitUpdating the Firmware on a Stack Automatic UpdateManual Update FTP Creating a Separate Vlan for File DownloadsFrom the Switching Vlan Vlan Membership page, click Add Navigate to the Routing IP IP Interface Configuration Page Stacking Dell PowerConnect 7000 Series Switches Click Apply Adding a Stack Member with Minimal Interruption Removing a Stack Member with Minimal Interruption Merging Two Operational Stacks Master FailoverEffect of Master Failover on PoE Devices Stack Member Failover Failover ScenariosScenario Stack Split Stack Split with Manager Failure Nonstop Forwarding Nonstop Forwarding Scenario Initiating a Warm Failover of the Manager UnitNonstop Forwarding Example Router NSF Scenario Configuration via CLIStack Switch Switch NSF Example Parameter Timing NSF Re-convergence TimingSmall Configuration Stacking CLI CommandsSummary Stacking Web Interface