Chapter 2. Installation

ARC-101Installation & Operation Manual

 

 

 

 

 

 

Power

Front and Rear Panel Clearance

Ambient Requirements

Installation of a Single Unit

2.3Site Requirements

The ARC-101 is powered by 90/260 VAC or -48 VDC.

The unit should be installed within 1.5 meters (5 ft.) of an easily accessible grounded AC outlet capable of supplying the appropriate voltage (90/260 VAC).

Allow at least 90 cm (36 inches) of clearance at the front of the unit for operator access. Allow at least 10 cm (4 inches) clearance at the rear of the unit for power cord connection.

The ambient operating temperature of the ARC-101 should be 0°C to 45°C (32°F-113°F), at a relative humidity of up to 90% non-condensing.

2.4 Rack Mounting Instructions

Rack adapter components for installing a single unit include one short bracket and one long bracket. Each bracket is fastened to the side walls of the unit by two screws (with flat washers) which are inserted into the two front holes on the side wall (the unit is supplied with nuts already in place on the inner side wall). Note that the short bracket fastens to the left side of the unit, and the long bracket to the right side of the unit (see Figure 2-1).

Once the brackets are fastened to the side walls, the unit is ready for installation in the 19" rack. Place the unit in the rack, and fasten the brackets to the side rails of the rack by means of the two screws situated on each side (not included in the kit).

Figure 2-1 Installation of a Single Unit

2-2

Rack Mounting Instructions

Image 18
Contents ARC-101 RAD data communications Headquarters US East US WestPage Warranty Safety Warnings Safety Status PortsRegulatory Information Safety Supplementary InformationContents Operation List of Figures List of Tables Chapter Introduction General DescriptionARC-101 Features Interfaces SupportedTraffic Management Loopback Mode Specifications Ordering ARC-101/# RM-1RM-2 Introduction Specifications General UnpackingSite Requirements Rack Mounting InstructionsTwo Units InstallationCable Connections ATM Connection Control PortChanging Control Port Mode PinoutAC Power Connection GroundingSC13M/155 Module Module CharacteristicsARC-101 Modules ST13S/155 ModuleST13L/155 Module CX/BNC/155 ModuleUTP/155 Module 12 UTP/155 Module Front PanelE3 Module T3 ModuleE1 and E1/LTU ModulesInserting Removing Modules Inserting Modules Removing ModulesJumper Settings For E1 and E1/LTUJumper Settings for T3 17 T3 Jumper LocationsInstallation Chapter Operation Name DescriptionOperating Procedure ARC-101 Block Diagram Operation Accessing, Using and Exiting Monitor Mode IntroductionARC Menu General Information Window Configuration WindowScreen Explanations General InformationParameters ConfigurationSystem ALL Changes will be SAVED. are YOU SURE? Y/NRight/Left Module Configuration Left ModuleAscii Terminal Configuration Ascii Terminal ConfigurationDiagnostics Window DiagnosticsPerformance Monitoring Window Link Status SONET/SDH Link Status Window SLMT3 Link Status Window Errors/Alarms displayed in Plcp Mode LOS LOC OOF AIS RDI BIP FebeE3 Link Status Window ATM TrafficATM Status E1 Link Status WindowCounter precision is 1/10,000 Software Management Performance Monitoring Window