Chapter 3. OperationARC-101Installation & Operation Manual
| 3.1 Operating Procedure |
|
|
Note | The interface modules are not |
| modules, make sure to first disconnect power to the |
| remove/install modules slowly and carefully (so as not to damage the modules |
| or the |
Turning on the
Normal
Operation
Turning off the
Procedure in
Case of
Malfunctioning
Install the
Upon
40 seconds to complete. The FLT indicator is ON during the
The
To turn off the
The following table lists several common problems and their possible solutions.
The PWR LED does not light up | − Check the power cord connection on the back of the unit and at the |
| mains outlet. |
| − Verify power availability at the mains outlet. |
|
|
Fault (FLT) LED blinks | − Unplug the unit (power OFF). Make sure that the modules are inserted |
| properly. Tighten the modules' screws. Power ON the unit. |
| − Using an ASCII terminal port, check for a fault indication in the |
| Diagnostics window. If there is a fault, inform a qualified |
| technician. |
|
|
Data transmission difficulties | − Ensure that the |
| used (media, data rate). |
| − Check the module's software configuration in the Configuration window. |
| − Verify that the SYNC indicator is ON. If it is OFF (indicating a fault in the |
| data reception link), run diagnostics on the remote unit from which data |
| is being transmitted to the |
| in the data transmission link), run diagnostics on the remote unit, or |
| implement a loop on the |
| SYNC LED is ON. |
Operating Procedure |