ARC-101Installation & Operation ManualChapter 2. Installation

Installation of

Rack adapter components for installing two units include two short side

Two Units

brackets (for rack mounting) and two flat rails (for fastening the two units

 

together)

Figure 2-2 Installation of Two Units

To install two units follow these instructions:

1.Place two units side by side. On the top of each unit are four grooves. The grooves should line up when the units are placed side by side.

2.Place a flat rail on each of the groves in the center of the two units.

3.Fasten the brackets to the units using the 8 screws provided.

4.Place the assembled units in the rack, and fasten the brackets to the side rails of the rack, by means of the two screws situated on each side, as shown in Figure 2.2 (not included in the kit).

2.5 Cable Connections

The ARC-101 has several connectors on its front panel (see Figure 2-3) for ATM connection and connection to an ASCII terminal, and a power connector on its rear panel.

ATM Connection

Control Port

Connection

Figure 2-3 ARC-101 Front Panel

Connect the appropriate cables to the connectors in both modules.

The CONTROL port connector is an RS-232/V.24 RJ-45 connector for an ASCII terminal (9600 baud).

Cable Connections

2-3

Image 19
Contents RAD data communications Headquarters US East US West ARC-101Page Warranty Safety Status Ports Safety WarningsRegulatory Information Supplementary Information SafetyContents Operation List of Figures List of Tables General Description Chapter IntroductionInterfaces Supported ARC-101 FeaturesTraffic Management Loopback Mode Specifications RM-1 Ordering ARC-101/#RM-2 Introduction Specifications Unpacking GeneralRack Mounting Instructions Site RequirementsATM Connection Control Port InstallationCable Connections Two UnitsPinout Changing Control Port ModeGrounding AC Power ConnectionST13S/155 Module Module CharacteristicsARC-101 Modules SC13M/155 ModuleCX/BNC/155 Module ST13L/155 Module12 UTP/155 Module Front Panel UTP/155 ModuleT3 Module E3 ModuleModules E1 and E1/LTUInserting Modules Removing Modules Inserting Removing ModulesFor E1 and E1/LTU Jumper Settings17 T3 Jumper Locations Jumper Settings for T3Installation Name Description Chapter OperationOperating Procedure ARC-101 Block Diagram Operation Introduction Accessing, Using and Exiting Monitor ModeARC Menu General Information Configuration WindowScreen Explanations General Information WindowALL Changes will be SAVED. are YOU SURE? Y/N ConfigurationSystem ParametersLeft Module Right/Left Module ConfigurationAscii Terminal Configuration Ascii Terminal ConfigurationDiagnostics Diagnostics WindowPerformance Monitoring Window Link Status SLM SONET/SDH Link Status WindowLOS LOC OOF AIS RDI BIP Febe T3 Link Status Window Errors/Alarms displayed in Plcp ModeE1 Link Status Window ATM TrafficATM Status E3 Link Status WindowCounter precision is 1/10,000 Software Management Performance Monitoring Window