Chapter 2
Installation
This chapter contains mechanical and electrical installation procedures for connecting the
2.1 General
The
2.2Unpacking
∙Inspect the equipment container before unpacking. Note and report evidence of damage immediately.
∙Place the container on a clean flat surface. Cut all straps and open, or remove top.
∙Remove the unit carefully and place it securely on a clean surface.
∙Remove all packing material and inspect the unit for damage. Report any damage immediately.
Site Requirements |