Chapter 3. Operation | |
|
|
Activation of Tests
Operational
Jumper and
Switch Changes
Warning
In order to verify that the
If you need to reconfigure the
Only authorized or qualified personnel should have access inside the equipment. Disconnect the
For guidance in repositioning the jumpers and switches, refer to Electrical Installation in Chapter 2. The equipment will become unsafe for connection to telecommunication networks in some locations, if the signal ground is disconnected from the chassis ground.
Power Off | To turn off the AC power to the |
Procedure | from the AC source. |