RAD Data comm ASM-20 operation manual Appendix A. Ethernet Interface Installation and Operation

Page 53

Appendix A. Ethernet Interface

ASM-20Installation and Operation Manual

 

 

A-6 Installation and Operation

Image 53
Contents RAD data communications Headquarters US East US West ASM-20Page Warranty Ports Safety Status Safety WarningsRegulatory Information Supplementary Information SafetyAdjust the jumpers. See , Installation and Setup Installing and Operating ASM-20Quick-Start Guide INT or EXT and the other modem RCV LBTPreface Conventions Contents Troubleshooting and Diagnostics List of Figures List of Tables Applications Chapter IntroductionOverview Following DTE interface options are available DTE interfaceFront Panel Physical DescriptionFunctional Description CDD conditional diphase modulation techniqueAsync to Sync Converter Range See Table Level Technical SpecificationsUnloaded twisted pair 19 to 26 AWG Timing Elements Digital Interface DiagnosticsRed Bit errors Err Yellow PowerPower Supply 115 or 230 V 10% 47 to 63 Hz 5W Weight 290 gm / 10.1 ozBaud 19 AWG 22 AWG 24 AWG 26 AWG Rate Approximate RangeIntroduction Technical Specifications Site Preparation and Prerequisites Chapter Installation and SetupIntroduction Electrical Installation Package ContentsMechanical Installation ASM-20 X.21 Rear Panel Strap Selection Setting Internal Jumpers SwitchesX.21, one of the modems should be set to RCV clock PCB Layout DiagramJumper Function Possible Factory Switch Identity Settings ASM-20 Strap Selection SettingsStart Bit Data Bits Parity Stop Bit No. of Bits Power Connection Installation and Setup Electrical Installation Chapter Operation Controls and IndicatorsGeneral ASM-20Name Type Function Control and Indicator FunctionsOperating Instructions Power On ProcedureProcedure Activation of Tests Operational Jumper Switch ChangesPower Off Frequently Asked Questions Chapter Troubleshooting DiagnosticsDifferences in Versions ASM-20 ASM-20-2Bit Error Rate Tester Bert Loop Tests ProcedureBert Using Loops Local Test Analog Loopback Modem Self TestRemote Digital Loopback Communication Link TestsRemote ASM-20 in Digital Loopback Local Digital LoopbackASM-MN-214 Card Cage Chapter Card Cage VersionASM-MN-214 Rear Panel ASM-20/R Card VersionAC Supply 100, 115 or 230 VAC DC Supply -48 VDC Power SupplyASM-MN-214 Front Panel Power Supply with RedundancyInstallation Card Cage Version Installation Description Appendix a Ethernet InterfaceSignal Pin DB-25 RJ-45 IR-ETH Connector OptionsGeneral Ethernet Bridge SpecificationsInstallation and Operation Option Other devices do notDescription Location Color Name Table A-3 IR-ETH Bridge LED IndicatorsAppendix A. Ethernet Interface Installation and Operation General Description Appendix B IR-G.703 Codirectional Interface 64 kbpsFigure B-2 Location of JP1 on the IR-G.703 Interface Module EXT ModeOdem a Odem B INT/RCV ModeModem B Page Figure C-1 Typical ASM-20 X.21 Application Appendix C IR-X.21B Interface ModulePin Function Table C-1 IR-X.21B DB-15 RS-422 Connector Pin AssignmentInterface module $87,21 25&21,18 Position IR-X.21B Interface ModuleFigure C-4 EXT Mode Timing Block Pin Circuit Function Appendix D DTE Interface ConnectorsRTS Signal General 13/4/99 Pin Circuit Signal Function RS-449 RS-422/423 EIA PinsAppendix E Connection to RS-422 Appendix E. Connection to RS-422 Installation of the Unit Case into a 19 Rack Appendix F Unit Case AssemblyInstallation of a Single Unit Unit CaseFigure F-1 Installation of a Single Unit Installation of Two UnitsAppendix F. Unit Case Assembly Figure F-3 Installation of Two Units