4. SETUP
DIAGNOSTIC AIDS
Two red LEDs and one Green LED are mounted
Cable LED
Regular Blinking- Blinking but mainly ON Blinking but mainly OFF
Error LED
On
Both LEDs
Off
Data LED (Iss PCB 4 onwards only) is
Test Link
Telemetry and video signals are OK.
-No Telemetry from the transmitter.
-No video from the camera.
-Telemetry transmission error.
-No power or major PCB fault.
- Will flash on and off very fast when data being sent to the dome.
-Is used to confirm correct operation of the
Rx100 and dome and also that the RS485 connection is correct. Shorting the link after the Rx100 is powered up will cause the dome to pan left and zoom in. Removing the link will stop the pan left and will zoom out the lens. This is dependant on dome type.
All BBV equipment is designed to
VIDEO LAUNCH AMPLIFIER AND CABLE LENGTH COMPENSATION
The interface features a video launch amplifier with two variable controls situated close to the BNC connectors: Lift and Gain. These are
Fig. 3 Launch Amplifier
HF Lift
Gain
CAMERA | Video | |
LIFT | from | |
dome | ||
| ||
GAIN |
|
Video |
to |
transmitter |
TELEMETRY
The purpose of each control is:
GAIN | varies the overall signal level. |
LIFT | boosts the high frequency component of the video |
signal. If the high frequency component is too low, picture appears ‘washed out’ and lacking detail.
Default position adjusted for 500M of CT125.
For shorter cable lengths, turn the Gain control
Rx100 installation manual V1.17 29 Aug 08.doc | Page 9 |