Hoshizaki KM-2400SRF3, KM-2400SRH3 service manual 2nd Cycle and after with no pump drain

Page 16

2nd Cycle and after with no pump drain

IMPORTANT

Freeze cycle time is limited to 50 minutes even if Float Switch does not open.

1.Float Switch opens and signals to complete freeze cycle.

2.Thermistor reads 48° F. Defrost Timer starts counting.

IMPORTANT Water Valve opening is limited to 6 minutes.

4.After the first 5 minutes in freeze cycle. Ready to complete freeze cycle when Float Switch circuit opens.

IMPORTANT

Board never accepts freeze completion signal within the first 5 minutes in freeze cycle.

3.Defrost Timer stops counting.

Defrost cycle is completed and freeze cycle starts.

IMPORTANT

1.Board never accepts defrost completion signal within the first 2 minutes in defrost cycle.

2.Defrost cycle time is limited to 20 minutes even if Defrost Timer does not stop counting.

16

Image 16
Contents Stackable Crescent Cuber Hoshizaki AMERICA, INC Contents Maintenance Specifications Condensing UNIT, URC-24F Specifications Model URC-24F II. General Information Construction Features of Control Products E Controller Board Controller BoardSOLID-STATE Control Controller BoardPage Beep every 3 sec. = High Evaporator Temperature 127 F Minute Fill CycleHarvest Cycle Freeze CycleControl Products HOSHIZAKI001 Board Control Products HOS-001A Board Sequence 1st Cycle 2nd Cycle and after with pump drain Important Water Valve opening is limited to 6 minutes2nd Cycle and after with no pump drain Controls and Adjustments OFFSetting Time Setting Frequency Checking the Controller Board Page III. Technical Information Wiring Diagram Timing Chart Page Performance Data IV. Service Diagnosis No ICE Production Problem Possible Cause RemedyController Board Problem Possible Cause Remedy Evaporator is Frozen UP ThermistorAbnormal ICE LOW ICE ProductionOthers Removal and Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Evacuation and Recharge R-404ABrazing Removal and Replacement of Compressor Important Removal and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of HOT GAS Valve and Line Valve Removal and Replacement of Evaporator Important Page Removal and Replacement of Thermistor Caution Removal and Replacement of FAN Motor Removal and Replacement of Water Valve Removal and Replacement of Pump MotorRemoval and Replacement of Spray Tubes VI. Cleaning and Maintenance Instructions Important Preparing the Icemaker for Long StoragePage Cleaning Procedure Cleaning Procedure Page Sanitizing Procedure Following Cleaning Procedure Maintenance