Hoshizaki KM-2400SRF3, KM-2400SRH3 service manual Removal and Replacement of Expansion Valve

Page 36

5. REMOVAL AND REPLACEMENT OF EXPANSION VALVE

IMPORTANT

Sometimes moisture in the refrigerant circuit exceeds the Drier capacity and freezes up at the Expansion Valve. Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the insulation and the Expansion Valve Bulb on the suction line.

5)Remove the Expansion Valve Cover, and disconnect the Expansion Valve using brazing equipment.

6)Braze the new Expansion Valve, with nitrogen gas flowing at the pressure of 3-4 PSIG.

WARNING

1.Always protect the valve body by using a damp cloth to prevent the valve from overheating. Do not braze with the valve body exceeding 250°F.

2.Do not put a direct flame on the compressor insulation. A wet cloth or barrier may be needed.

7)Install the new Drier.

8)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

9)Evacuate the system, and charge it with refrigerant. See the Charge Label in the machine compartment for the required refrigerant charge.

10)Attach the Bulb to the suction line in position. Be sure to secure it with clamps and to insulate it.

11)Place the new set of Expansion Valve Covers in position.

12)Replace the panels in their correct positions.

13)Turn on the power supply.

36

Image 36
Contents Stackable Crescent Cuber Hoshizaki AMERICA, INC Contents Maintenance Specifications Condensing UNIT, URC-24F Specifications Model URC-24F II. General Information Construction Features of Control Products E Controller Board Controller BoardSOLID-STATE Control Controller BoardPage Beep every 3 sec. = High Evaporator Temperature 127 F Minute Fill CycleHarvest Cycle Freeze CycleControl Products HOSHIZAKI001 Board Control Products HOS-001A Board Sequence 1st Cycle 2nd Cycle and after with pump drain Important Water Valve opening is limited to 6 minutes2nd Cycle and after with no pump drain Controls and Adjustments OFFSetting Time Setting Frequency Checking the Controller Board Page III. Technical Information Wiring Diagram Timing Chart Page Performance Data IV. Service Diagnosis No ICE Production Problem Possible Cause RemedyController Board Problem Possible Cause Remedy Evaporator is Frozen UP ThermistorLOW ICE Production Abnormal ICEOthers Removal and Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Evacuation and Recharge R-404ABrazing Removal and Replacement of Compressor Important Removal and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of HOT GAS Valve and Line Valve Removal and Replacement of Evaporator Important Page Removal and Replacement of Thermistor Caution Removal and Replacement of FAN Motor Removal and Replacement of Water Valve Removal and Replacement of Pump MotorRemoval and Replacement of Spray Tubes VI. Cleaning and Maintenance Instructions Important Preparing the Icemaker for Long StoragePage Cleaning Procedure Cleaning Procedure Page Sanitizing Procedure Following Cleaning Procedure Maintenance