Hoshizaki KM-2400SRF3, KM-2400SRH3 service manual Removal and Replacement of Compressor Important

Page 34

3.REMOVAL AND REPLACEMENT OF COMPRESSOR IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

Note: Due to the ability of the POE oil in the compressor to absorb moisture quickly, the Compressor must not be opened more than 15 minutes for replacement or service. Do not mix lubricants of different compressors even if both are charged with R-404A, except when they use the same lubricant.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the Terminal Cover on the Compressor, and disconnect the Compressor Wiring.

5)Remove crankcase heater.

6)Remove the Discharge and Suction Pipes.

7)Remove the Hold-down Bolts, Washers and Rubber Grommets.

8)Slide and remove the Compressor. Unpack the new Compressor package. Install the new Compressor.

9)Place the Compressor in position, and secure it using the Bolts, Washers, and Rubber Grommets.

10)Remove nuts from the Suction and Discharge.

11)Tighten the Suction and Discharge nuts to 80ft-lbs and 68ft-lbs respectively, while purging with nitrogen gas flowing at the pressure 3-4 PSIG.

12)Apply a thin coat of Dow Corning 340 Heat Sink Compound (Part# 8601-0113) to the crankcase heater, and insert it into the well.

13)Install the new Filter Drier.

14)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

34

Image 34
Contents Stackable Crescent Cuber Hoshizaki AMERICA, INC Contents Maintenance Specifications Condensing UNIT, URC-24F Specifications Model URC-24F II. General Information Construction SOLID-STATE Control Features of Control Products E Controller BoardController Board Controller BoardPage Harvest Cycle Beep every 3 sec. = High Evaporator Temperature 127 FMinute Fill Cycle Freeze CycleControl Products HOSHIZAKI001 Board Control Products HOS-001A Board Sequence 1st Cycle 2nd Cycle and after with pump drain Important Water Valve opening is limited to 6 minutes2nd Cycle and after with no pump drain Controls and Adjustments OFFSetting Time Setting Frequency Checking the Controller Board Page III. Technical Information Wiring Diagram Timing Chart Page Performance Data IV. Service Diagnosis No ICE Production Problem Possible Cause RemedyController Board Problem Possible Cause Remedy Evaporator is Frozen UP ThermistorAbnormal ICE LOW ICE ProductionOthers Refrigerant Recovery Removal and Replacement of ComponentsService for Refrigerant Lines Evacuation and Recharge R-404ABrazing Removal and Replacement of Compressor Important Removal and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of HOT GAS Valve and Line Valve Removal and Replacement of Evaporator Important Page Removal and Replacement of Thermistor Caution Removal and Replacement of FAN Motor Removal and Replacement of Water Valve Removal and Replacement of Pump MotorRemoval and Replacement of Spray Tubes VI. Cleaning and Maintenance Instructions Important Preparing the Icemaker for Long StoragePage Cleaning Procedure Cleaning Procedure Page Sanitizing Procedure Following Cleaning Procedure Maintenance