8.REMOVAL AND REPLACEMENT OF CONDENSING PRESSURE REGULATOR (C.P.R.)

IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

1)Turn off the power supply.

2)Remove the panels from the remote condenser unit.

3)Recover the refrigerant and store it in an approved container.

4)Before heating, break off the stub on the dome to release the dome charge.

5)Disconnect the C.P.R. using brazing equipment.

6)Install the new C.P.R. Use nitrogen gas at the pressure of 3-4 PSIG when brazing the C.P.R.

WARNING

Always protect the C.P.R. body by using a damp cloth to prevent the C.P.R. from overheating. Do not braze with the C.P.R. body exceeding 250°F.

7)Install the new Drier.

8)Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.

9)Evacuate the system and charge it with refrigerant. See the Charge Label in the machine compartment in the icemaker.

10)Replace the panels in their correct positions.

11)Turn on the power supply.

39

Image 39
Contents Stackable Crescent Cuber Hoshizaki AMERICA, INC Contents Maintenance Specifications Condensing UNIT, URC-24F Specifications Model URC-24F II. General Information Construction Controller Board Features of Control Products E Controller BoardController Board SOLID-STATE ControlPage Freeze Cycle Beep every 3 sec. = High Evaporator Temperature 127 FMinute Fill Cycle Harvest CycleControl Products HOSHIZAKI001 Board Control Products HOS-001A Board Sequence 1st Cycle Important Water Valve opening is limited to 6 minutes 2nd Cycle and after with pump drain2nd Cycle and after with no pump drain OFF Controls and AdjustmentsSetting Time Setting Frequency Checking the Controller Board Page III. Technical Information Wiring Diagram Timing Chart Page Performance Data Problem Possible Cause Remedy IV. Service Diagnosis No ICE ProductionController Board Problem Possible Cause Remedy Thermistor Evaporator is Frozen UPLOW ICE Production Abnormal ICEOthers Evacuation and Recharge R-404A Removal and Replacement of ComponentsService for Refrigerant Lines Refrigerant RecoveryBrazing Removal and Replacement of Compressor Important Removal and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of HOT GAS Valve and Line Valve Removal and Replacement of Evaporator Important Page Removal and Replacement of Thermistor Caution Removal and Replacement of FAN Motor Removal and Replacement of Pump Motor Removal and Replacement of Water ValveRemoval and Replacement of Spray Tubes Preparing the Icemaker for Long Storage VI. Cleaning and Maintenance Instructions ImportantPage Cleaning Procedure Cleaning Procedure Page Sanitizing Procedure Following Cleaning Procedure Maintenance