activated by the closure of an interlock switch or EMO button, provides a DC voltage to the over-voltage shunt trip coil of the input circuit breaker. In the standard EMO design, the DC voltage is derived via a full wave bridge rectifier powered from a 24 volt AC tap on the main transformer secondary winding.

For SEMI S2-0200 approval, the EMO functions differently from the standard EMO. The SEMI S2-0200 EMO operates as a normally closed (N.C.) circuit which provides a continuous DC voltage to an under-voltage shunt trip coil in the input circuit breaker. Activating the EMO pushbutton or a panel interlock opens the safety circuit and removes DC voltage activating the shunt trip. The DC voltage is derived from a separate 24 volt AC step- down transformer powered from the output side of the input circuit breaker. When first starting the GPI Series 2000, no power is available at the circuit breaker output since it’s under-voltage shunt trip will ensure that it re- mains in the tripped position. When first starting the power conditioner, it is necessary to provide power to the EMO circuit. This is accomplished via a “push to start” pushbutton located on the front panel. The button is iden- tified by a label with the legend “DEPRESS BUTTON WHILE ENERGIZING MAIN BREAKER” The “push to start” button energizes the EMO circuit power transformer from the input side of the input circuit breaker, which provides the initial DC voltage to energize the under-voltage shunt trip of the input circuit breaker. For starting GPI Series 2000 power conditioners equipped with SEMI S2-0200 option, follow these simple steps:

1.Make sure that the input circuit breaker is rotated fully to it’s farthest left position.

2.Make sure that the EMO pushbutton is in its operating position (turn in direction of arrow to disengage)

3.Press and hold the “push to start” button while rotating the input circuit breaker to the right

4.Verify that the “power on” LED on the front panel is illuminated

5.Release the “push to start” button

The power conditioner will now be operating normally and any connected loads may be energized. Please con- sult the schematics on pages 34, 35, and 36 of this manual for more information.

If a power conditioner equipped with the SEMI S2-0200 option is de-energized for

any reason (including a shunt trip due to EMO or interlock activation), mains power will still be present at the input side of the input circuit breaker, and at the terminals

of the “push to start” switch. Working inside the power conditioner under these conditions may be classified by SEMI S2-0200 guidelines as a Type 4 task. The task may be reduced to Type 1 if mains power is de-energized and locked out at the facility source. The manufacturer recommends locking and tagging out the facility source whenever it is necessary to enter the power conditioner enclosure.

Conditioned Power Center

29

Image 29
Contents CPC Series Conditioned Power Center Table of Contents Service and Support E a S E General Ansi Warning Notices SafetyInherent Hazards Alerts and LabelsWear protective gear before servicing internal parts Line Voltage Present With Machine Power OFFLockout/Tagout Safety InterlocksEmergency Contact Information Conformance with Applicable Laws and RegulationsProduct Liability Product Purpose Product OverviewOptional Features Standard FeaturesFeature Unpackaging PreparationPreparation Figure D Shipping Crate Disassembly 10 to 20 kVA Installation Alternate Conduit Landing Locations Outer Panel RemovalMain Input Circuit Breaker Fixed Input Circuit BreakersProgrammable Circuit Breakers Isolation TransformerFigure G Transformer Primary Voltage AdjustmentGrounding Output Voltage Fine AdjustmentFigure J Lockout/Tagout ProcedureModels With Optional Line Cord/Output Receptacles Input Power ConnectionsOutput Power Connections Operation Restoring For ServiceEnergizing the Power Conditioner Orderly Shutdown Energizing the LoadConditioned Power Center Options Phase Loss/Low Voltage Detection and ProtectionExternal EMO Seismic AnchorageSemi S2-0200 Compliant EMO Input Power Conductor RestraintsSemi S2-0200 Certification Options Conditions Requiring Troubleshooting Troubleshooting/MaintenanceSource Circuit Breaker Trip Input Circuit Breaker TripsTvss Fault LEDs Illuminate Harmonic Filter Circuit Breaker Trips Out Routine MaintenanceProduct Warranty Service and SupportTechnical and Service Assistance Customer Service CPC Series Schematic SpecificationsGPI Series 2000 Standard EMO GPI Series 2000 Semi S2 EMO Important ALL Work to be Done By a Licensed Electrician Output Voltage Fine AdjustmentTitle Rev. Letter Rel. Date Next Rev. Level Document Revision HistorySM5505- Rev. a 03/01/2006, 2006 ETA Systems39