ETA Systems SM5505 manual Figure D Shipping Crate Disassembly 10 to 20 kVA

Page 16

Section 4 - Preparation

Figure D - Shipping Crate Disassembly - 10 to 20 kVA

1.Cardboard outer carton

2.Shipping pallet

3.2 x 4 front cleat

4.Front skid

After removing the front cleat and front skid, the pallet may be rocked for- ward on the middle skid and the power conditioner may be easily rolled off the pallet and onto the floor.

1

3

2

4

Figure E—Shipping Crate Disassembly - 25 kVA to 300 kVA

1.Crate Top

2.Packing Block

3.Front Side

4.Back Side

5.Right Side

6.Left Side

7.Shipping Pallet/Skid

Shipping crate should be dis- assembled in the numerical order shown. Removing pan- els 1 through 7 will provide total access to the power con- ditioner, which is enclosed in foam wrap and plastic and banded to shipping skid #7.

6

1

 

2

 

4

5

 

3

 

7

 

IMPORTANT ! Retain all parts of the shipping container and packaging material until after the CPC series has been installed and proper operation verified. Once installed and operational integrity is verified, the packaging material may be discarded.

16

Conditioned Power Center

Image 16
Contents CPC Series Conditioned Power Center Table of Contents Service and Support E a S E General Safety Ansi Warning NoticesInherent Hazards Alerts and LabelsLine Voltage Present With Machine Power OFF Wear protective gear before servicing internal partsSafety Interlocks Lockout/TagoutProduct Liability Conformance with Applicable Laws and RegulationsEmergency Contact Information Product Overview Product PurposeStandard Features Optional FeaturesFeature Preparation UnpackagingPreparation Figure D Shipping Crate Disassembly 10 to 20 kVA Installation Outer Panel Removal Alternate Conduit Landing LocationsMain Input Circuit Breaker Fixed Input Circuit BreakersIsolation Transformer Programmable Circuit BreakersTransformer Primary Voltage Adjustment Figure GOutput Voltage Fine Adjustment GroundingLockout/Tagout Procedure Figure JOutput Power Connections Input Power ConnectionsModels With Optional Line Cord/Output Receptacles Energizing the Power Conditioner Restoring For ServiceOperation Energizing the Load Orderly ShutdownConditioned Power Center Phase Loss/Low Voltage Detection and Protection OptionsExternal EMO Seismic AnchorageSemi S2-0200 Certification Input Power Conductor RestraintsSemi S2-0200 Compliant EMO Options Troubleshooting/Maintenance Conditions Requiring TroubleshootingSource Circuit Breaker Trip Input Circuit Breaker TripsTvss Fault LEDs Illuminate Routine Maintenance Harmonic Filter Circuit Breaker Trips OutTechnical and Service Assistance Customer Service Service and SupportProduct Warranty Specifications CPC Series SchematicGPI Series 2000 Standard EMO GPI Series 2000 Semi S2 EMO Output Voltage Fine Adjustment Important ALL Work to be Done By a Licensed ElectricianDocument Revision History Title Rev. Letter Rel. Date Next Rev. LevelSM5505- Rev. a 03/01/2006, 2006 ETA Systems39